<strong>Fort</strong> <strong>Knox</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>20.0 RECOMMENDATIONSThe <strong>Fort</strong> <strong>Knox</strong> mine is a producing gold mine <strong>for</strong> <strong>Kinross</strong> <strong>Gold</strong> Corporation. Therecommendation <strong>for</strong> successive work phases is not required.68
<strong>Fort</strong> <strong>Knox</strong> <strong>Mine</strong> <strong>Technical</strong> <strong>Report</strong>21.0 REFERENCESBakke, A., 1994, The <strong>Fort</strong> <strong>Knox</strong> ‘Porphyry <strong>Gold</strong> Deposit- Structurally controlledstockwork and shear quartz vein, sulphide-poor mineralization hosted by a LateCretaceous Pluton, East Central Alaska, Canadian Institute of Mining Special Volume46.Bakke, A., Morrell, B., and Odden J. (1998), The <strong>Fort</strong> <strong>Knox</strong> porphyry gold deposit, eastcentralAlaska: An overview and update. Porphyry and Hydro<strong>the</strong>rmal Copper and <strong>Gold</strong>Deposits. Australian <strong>Mine</strong>ral Foundation Conference Proceedings November, 1998. p.89-98.Blum, J.D., 1982: The Petrology, Geochemistry, and Isotope Geochronology of<strong>the</strong> Gilmore Dome and San Pedro Dome Plutons, Fairbanks District, Alaska,Unpublished M.S. Thesis, University of Alaska Fairbanks pp1-107.Bundtzen, T.K., 1981: The Geology and <strong>Mine</strong>ral Deposits of <strong>the</strong> Kantishna Hills, Mt.McKinley Quadrangle, Alaska, Unpublished M.S. Thesis, University of Alaska Fairbanks,pp1-237.Call & Nicholas, Inc, 2005, <strong>Fort</strong> <strong>Knox</strong> and Gil <strong>Mine</strong>s – Site Visit and Slope StabilityReview.Ekstrom, C., Jan. 2007: 2006 <strong>Fort</strong> <strong>Knox</strong> Dump Evaluation Summary, Internal Memo,pp1-3.Fairbanks <strong>Gold</strong> Mining, Inc, and <strong>Kinross</strong> <strong>Gold</strong> USA, 2007, <strong>Fort</strong> <strong>Knox</strong> <strong>Mine</strong> Walter CreekHeap Leach Project: Project Feasibility Evaluation, pp1-82.<strong>Gold</strong>er Associates, Inc., 1995 (c): Pit Slope Stability Investigation, <strong>Fort</strong> <strong>Knox</strong> Project;<strong>Gold</strong>er Associates, Inc., 2002 (a): Pit Slope Stability Study, Proposed 715 Pushback,<strong>Fort</strong> <strong>Knox</strong> Project;69