11.07.2015 Views

Tuolumne River Report - U.S. Fish and Wildlife Service

Tuolumne River Report - U.S. Fish and Wildlife Service

Tuolumne River Report - U.S. Fish and Wildlife Service

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TUOLUMNE RIVER TECHNICAL ADVISORY COMMITTEEHABITAT RESTORATION PLAN FOR THE LOWER TUOLUMNE RIVER CORRIDOR130Left bank looking downstreamRight bankRelative Elevation (ft)125120115110105100Construct floodplain, revegetate withcottonwoods <strong>and</strong> valley oaksRevegetate toe of berm witharroyo willow (shrub)FillBermCutPre-construction Ground SurfaceDesign Ground SurfacePre-construction Low-flow Water Surface5,400 cfs Pre-construction Water Surface5,400 cfs Post-construction Water SurfacePre-construction Pond SurfacePost-construction Pond surface9590MiningPitFill85-400 -350 -300 -250 -200 -150 -100 -50 0 50 100 150 200 250 300 350 400Distance from Left Bank Pin (ft)Figure 4-2. Proposed modification to berm confined channel morphology to improve flood conveyance <strong>and</strong> reducehabitat damage during large floods.120115Left bank lookingdownstreamRight bankCHAPTER 4Relative Elevation (ft)1101051009590TerracesFloodplainCutFloodplainTerraces85Pre Construction Ground SurfaceDesign Ground SurfaceFill invert to reverse years ofPre-construction Low-flow Water Surface80channel downcutting5,400 cfs Pre-construction Water Surface5,400 cfs Post-Construction Water Surface75-50 50 150 250 350 450 550 650 750 850 950 1050 1150 1250Distance From Left Bank Pin (ft)Figure 4-3. Proposed modification to riparian <strong>and</strong>/or agriculturally encroached channel morphology to improve floodconveyance <strong>and</strong> reduce habitat damage during large floods.152

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!