11.07.2015 Views

Construction Management Plan - Southwark Council Planning Pages

Construction Management Plan - Southwark Council Planning Pages

Construction Management Plan - Southwark Council Planning Pages

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2 EnablingWorks2.1 Asbestoss RemovalThe removal of asbestos identified in the ground o the existing Leisure Centre Site will be completed by4 Futures on behalf of <strong>Southwark</strong> <strong>Council</strong> prior to demolition commencing.2.2 DemolitionAs agreed with <strong>Southwark</strong> <strong>Council</strong>, the following demolition works will w be carriedd out but 4 Futures:• Demolish and remove from the Site any equipment, fixtures and fittings, chattels, all existingmechanical and electrical services and all building structures (excluding the building slab) down toground level and in the case of the swimming pool on the Site to the undersidee of the baseof theswimming pool ncluding any and all asbestos materials and otherr Hazardous Substances within theexisting building within the boundary of the Site;• Demolish and remove from the Site all incoming and outgoing public health services andtelecommunications to or fromthe existing building on the Site leaving them capped at the boundaryof theSite;• Demolish and remove from the Site all access ramps, egress ramps, handrails and any andall streetfurniture;• Handover the Site to the Tenant in a clear clean and safe condition together with a site clearancecertificate and survey information of any known remaining elements of substructure and known inground obstructions;It has therefore beenassumed that the removal of any deep footingss will be demolished andremovedby Lend Lease.2.3 Enabling WorksThe following pre‐commencement and enabling works activities to be carried out following vacantpossession of the Site from <strong>Southwark</strong> <strong>Council</strong> are to be confirmed.• Statutory notifications and consents, hoarding and scaffold licences, road closures (if required) etc;• Identification of methods andproceduress to comply with Section 61 of the Control of Pollution Act;1974 agreementsand consents;• Approval of method statements and risk assessments, scaffoldingg and temporary works designs;• If anyfurther demolition is equired following taking possession of o the Site, preparation of a writtenplan for carrying out the demolition in accordance with Regulation 29 of the CDM regulations toidentify how danger and risk from these activities willl be prevented;• Alteration and adaptation of site hoardingg originally provided by demolition d contractor• Service terminations / disconnections at the Site boundary by utility companies;• Supply and installation of Siteaccommodation & welfare facilities;• Installation of temporary power, lighting and water services;• Facilitation of tree pruning, tree removal and installation of tree protection p measures;• Establishment of fire escape routes r / systems & emergency plans; ; and• Early environmental clean of the properties, sharp needle sweep, hazardous material identificationand pest control within the Site boundary.• Removal of hazardous materialsSt Mary’s Residential Detailed <strong>Plan</strong>ning Application May 20128

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!