4.2 Offloading and Storage AreasVehicles will be directed to their designated delivery point or holding/storage areas, which will bemarshalled by logistics personnel at all in advance, ensuring that onlyy authorisedd personnel are givenaccess.All deliveries will be notified in advance to the contractor’s logistics team. t Access slots will be allocated.No delivery vehicle will, as far as it is possiblee to enforce,leave the Site empty. A “take‐back”” policy willbe encouraged whereby all return vehicles will take “associated waste/packaging” with them.4.3 Personnel and Vehicle SegregationAll pedestrian routeswill be clearly defined utilising temporary fencing and pedestrian route signagewhere necessary. Pedestrian crossover routes will have appropriate warning signs displayed, e.g. give‐ofway signs, vehicles crossing etc.All Site operatives will be given a specific Sitee induction, and briefed with reference to the usedesignated pedestrian access ways and crossover points.4.4 Temporary Road ClosuresNo long‐terestablish and remove cranes or to t deliver items of plant and equipment. Notices regarding any plannedroad closures are envisaged. However, short‐term closures may bee required in order toclosures and diversions of eitherr roads or footpaths shalll be given byy the principle contractorr to<strong>Southwark</strong> <strong>Council</strong>, TfL and London Buses, the police, thefire brigadee and other emergency services. sIn order to further minimise the likelihood off congestion, strict monitoring and control of vehiclesentering, exiting andtravelling through the site would bemaintained. This wouldd include:• The setting of specific delivery and collection times;• Consolidation of deliveries wherever possible;• A system of ‘just in time’ deliveries; and• Pedestrian accesss around thesite perimeter will be safely maintained.With regard to on site and highway safety, Lend Lease is committed to t operatingg incident and injury free(IIF) and is committed to realising this wherever Lend Lease has a presence.St Mary’s Residential Detailed <strong>Plan</strong>ning Application May 201214

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!