• Consents to discharge from the Environment Agency or Thames Water may be subject to specifiedconditions. Monitoring will beundertakenn as appropriate and records kept demonstratingcompliance with any specifiedconditions.7.13 Environmental <strong>Management</strong> <strong>Plan</strong>A St Mary’s Environmental <strong>Management</strong> <strong>Plan</strong>n (EMP) covering the Development will be implemented.This planwill deal with the potential impactss arising fromthese activities and identify implementation ofeffectivee management controls, for examplee the employment of dust suppression methods and use ofproperlymaintainedplant. This plan would set out the management; monitoring, auditing and trainingprocedures in place to ensure compliance with the relevant legislation and ensure significantt impacts onthe surrounding environment are mitigated. Thus the Site specific EMP will:• Identify environmental aspects;• Specify measurable targets tobe adheredd to; and• Detail mitigation measures tobe undertaken and management tools and procedures required forenvironmental management.• The EMP will include, but will not be limited to the following mainn items:• Programme and phasing of the works;• A broad plan of the construction works, highlighting the various stages and their context within theproject, includinga schedule of materials and manpower resourceas well as plant and equipmentschedules;• Detail of Site layout arrangements including temporary works plans for storage, accommodation,vehicular movements, delivery and access;• Site working hours;• Prohibited or restricted operations (locations, hours etc);• Details of type ofplant to be used and associated noise levels;• Details of operations that arelikely to result in disturbance and the expected duration with key dates, including a procedure for notification of f <strong>Southwark</strong> <strong>Council</strong> and relevant statutory and non‐community to provide information of anyy operations likely to cause disturbance (through meetingsstatutory (including neighbours) parties so that local arrangementts can be agreed;• Environmental Impacts and EIA Mitigationn Register;• A procedure to ensure communication is maintained with <strong>Southwark</strong> <strong>Council</strong> and the localand newsletters);• Provisions for affected parties to register complaints and the procedures for responding tocomplaints;• Provisions for reporting to <strong>Southwark</strong> <strong>Council</strong>;• Details of access and egress and proposedd routes for HGV’s; and• Details of Emergency Incidentt Procedure. .7.14 Site Waste <strong>Management</strong> <strong>Plan</strong> (SWMP)• At the outset a SWMP will be produced using BRE’s SMARTWastetool. This includes a waste forecastidentifying options for reuse, recycling and avoidanceof landfill and to recordd actual waste arisings.• The SWMP will also record responsibilities for waste management on Site, anyy waste eliminated orreduced through the design process, compliance withthe “Duty of o Care”, EnvironmentalProtectionAct 1990, and anytraining or awareness raising measures undertaken and reviews undertaken. It willalso provide environmental KPI’s which will be used to demonstrate performance levels againstspecified targets. The SWMP will be used in evidence toward environmental building assessmentssuch as the Code for Sustainable Homes.• Subcontract packages will be bought on the basis of trades disposing of their own major packagingwastein a sustainable fashionas far as possible. For example materials shouldd be packed in re‐usableSt Mary’s Residential Detailed <strong>Plan</strong>ning Application May 201232

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!