11.07.2015 Views

Construction Management Plan - Southwark Council Planning Pages

Construction Management Plan - Southwark Council Planning Pages

Construction Management Plan - Southwark Council Planning Pages

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5 Site Logistics5.1 General PrinciplesSet out below are the general principles of the Site logistics for:• early works and piling;• substructure and frame erection;• hoists and preston platforms; ;• envelope;• podium structure;• fit out5.1.1Early worksand piling;During the early stages of works the vehicle count will behigh due too the volumee of excavated material,pile arising and concrete deliveries. Lorries at this stage of the works will mostly be shorter wheelbaserigid vehicles (muck away and concrete) and will enter the Site from Brook Drive and Newington Butts/Elephant& Castle. Wheel cleaning facilities will be provided at the Site exits usingg large collection gulliesand water hoses.Piling rigs would be employed, with all of thee piling beingcompleted from groundd level. Materials in forpiling operations (rebar and shuttering materials) would be handled by a mobile crane (a crawler craneprovidedd by the piling contractorr in support of his rigs).Concretee is best delivered directly to point of pouring byconcrete wagons although this would beaugmented by crane& skip and dumper trucks for access to all corners of the Site. Sheet materials(hoardings and accommodation)) would be offloaded by forklift/ rough terrain telehandler provided bythe subcontractor5.1.2 Substructure and Frame ErectionnThe frame will be constructed with a tower crane and construction platform p and hoists. Protectivescreens will be used for safety and environmental reasons.5.1.3Building EnvelopeA cladding system will be erectedusing floorr mounted equipment (manipulatorsor monorails) andtower crane hook time allocatedto it. All cladding materials will be delivered d to floors by platform hoist.5.1.4Fit OutAll materials for the fit out will be delivered “Just In Time” (JIT) and distributed d too working floors byhoist.St Mary’s Residential Detailed <strong>Plan</strong>ning Application May 201215

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!