You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
METRO 06-1 to 30-1Maintenance and repair 9Repair workAssembling modules Place the two ground terminals [2] at opposite ends. Place the seal [3] on the contact surface of the bottom module. Position the module. Position the profile clamp [1] and fasten the clamp with screw [4] (also the ground for glassunits [6]).NoteAlways place the profile clamp screws behind the controller [5].9.5.2 Replacing vacuum valveMaterial damage!Parts which fall into the unit may cause operational faults.CAUTION! Make sure that no parts fall into the unit. Cover the opening of the machine and bin.Fig. 9.7 – Vacuum valve[1] Hexagonal nut[2] Implosion valve[3] Spacer rod[4] Contact surface of the spacer rod[5] Sealing disk[6] Vacuum seal[7] Hexagon-headed screw M6[8] Spring[9] Piston rod[10] Contact surface of the piston rod[11] Pneumatic cylinderRemoval Prepare the hopper <strong>loader</strong> for maintenance (see "Before starting work" on Page 32).Edition: February 2006 39