You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
METRO 06-1 to 30-1Option 11Marathon valve option (for abrasive materials)11.4.3 MaintenanceFig. 11.8 – Marathon valve[1] Marathon valve[2] Pipe to Marathon valve[3] Screw bushingRemoving Marathon valve Prepare the hopper <strong>loader</strong> for maintenance (see "Before starting work" on Page 32). Unscrew the screw bushing [3]. Pull the Marathon valve [1] with the pipe to Marathon valve [2] out of the inlet pipe.Installing Marathon valve Assemble in reverse order.Edition: February 2006 61