11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.12 TRENCH SAFETY ACT:All work shall con<strong>for</strong>m to the Trench Safety Act. Contractor shall include in his price the cost <strong>of</strong>con<strong>for</strong>ming to the Trench Safety Act.1.13 PRECONSTRUCTION CONFERENCE/PROJECT PROGRESS MEETING:A. Be<strong>for</strong>e the Contractor starts the work, a conference will be held to establish procedures <strong>for</strong>handling Shop Drawings and other submittal, and <strong>for</strong> processing Applications <strong>for</strong> Payment,and to establish a working understanding among the parties as to the work.B. At each project progress meeting, the Contractor shall develop and submit <strong>for</strong> approval aprogress schedule and phasing plan demonstrating complete fulfillment <strong>of</strong> all contractrequirements including all activities <strong>of</strong> subcontractors, equipment vendors and suppliers. Anupdated schedule shall be submitted with each pay request.1.14 TEST OR OPERATION:All tests and analyses which are called <strong>for</strong> in the Specifications and/orDrawings(geotechnical,concrete, bacteriological, pressure and leakage, etc.) are to be per<strong>for</strong>med by anIndependent Testing Laboratory, (approved by the <strong>City</strong>) and shall be at the Contractor’s expense.1.15 REMOVAL OF ALL TEMPORARY FACILITIES & RESTORATION OF SITE:Upon completion <strong>of</strong> the work, it shall be the responsibility <strong>of</strong> the Contractor to remove all temporaryfacilities including but not limited to pumps, fences, signs, temporary power, materials or other debris.The site, adjacent properties and Owner facilities, shall be restored to their original condition.1.16 VIDEO-TAPINGAt least one (1) week prior to start <strong>of</strong> construction, the Contractor shall have video tapes taken <strong>of</strong> allareas where construction is to take place. Such video tapes shall be provided to the Engineer be<strong>for</strong>econstruction commences. These video tapes shall serve as a record <strong>of</strong> the existing conditions <strong>for</strong>disputes arising from restoration, and should there<strong>for</strong>e be taken along the line <strong>of</strong> construction atsufficient detail as necessary to clearly depict details <strong>of</strong> existing conditions. The video tapes shall bestandard 3/4" VHS cassette type tapes in color. The Contractor shall be responsible <strong>for</strong> providing thenecessary equipment <strong>for</strong> the viewing <strong>of</strong> the video tapes at the Engineer’s <strong>of</strong>fice <strong>for</strong> the duration <strong>of</strong> theproject. All video tapes shall be indexed and catalogued in such a manner that each photographedarea is readily identifiable and shall also indicate the date and time (hour, minutes & seconds) onwhich the photograph was made. The Contractor shall also have video tape taken <strong>of</strong> any unusualconditions encountered during construction that are not already a matter <strong>of</strong> photographic record. Inany area where existing conditions cannot be determined by means <strong>of</strong> video tapes, the area shall berestored as approved by the Engineer at the Contractor’s expense. All video tapes shall become theproperty <strong>of</strong> the Owner. Construction shall not begin until video tapes have been delivered andapproved by Owner.1.17 RECORD DOCUMENTS:A. The Contractor shall maintain on site one set <strong>of</strong> the following record documents <strong>for</strong> use torecord actual revision to the Work:1. Construction Drawings2. Specifications3. Addenda4. Change Orders and other modifications to the Contract5. Approved Shop Drawings, product data, and samplesGeneral Requirements Section 01019-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!