11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 01010SUMMARY OF WORKPART 1GENERAL1.01 LOCATION OF WORK:All <strong>of</strong> the work is located in the <strong>City</strong> <strong>of</strong> <strong>West</strong> <strong>Palm</strong> <strong>Beach</strong>, <strong>Palm</strong> <strong>Beach</strong> County, Florida, at the <strong>City</strong>’sWater Treatment Plant, St Marys Repump Station, Kaye Street Repump Station, Ibis Repump Station,Cumberland Repump Station and <strong>Palm</strong> <strong>Beach</strong> Repump Station.1.02 PROJECT DESCRIPTIONA. The Contractor shall furnish all labor, materials, equipment, tools, services and incidentals tocomplete all work required by these specifications. This Work entails the painting <strong>of</strong> theexterior surface <strong>of</strong> tanks, silos, miscellaneous equipment, and repump station pump buildings(interior and exterior), including pumps and motors, pipe, conduit and vaults.B. The Contractor shall per<strong>for</strong>m the work complete, in place, per<strong>for</strong>m tests where applicable andready <strong>for</strong> continuous services and shall include repairs, replacements and restorationrequired as a result <strong>of</strong> damages caused during this construction.C. The Contractor shall furnish and install all materials, equipment and labor which is reasonablyand properly inferable and necessary <strong>for</strong> the proper completion <strong>of</strong> the Work, whetherspecifically indicated in the Contract Documents or not.1.03 REFERENCES:A. Whenever reference is made to the furnishing <strong>of</strong> materials or testing there<strong>of</strong> to con<strong>for</strong>m to thestandards <strong>of</strong> any technical society, organization or body, it shall be construed to mean thelatest standard, code, specifications or tentative specifications adopted and published at thedate <strong>of</strong> advertisement <strong>for</strong> bids, even though reference has been made to an earlier standard.The following list <strong>of</strong> specifications is hereby made a part <strong>of</strong> the Contract, the same as ifherein repeated in full. In the event <strong>of</strong> any conflict between any <strong>of</strong> these specifications,standards, codes or tentative specifications and the specifications, the latter shall govern. Inthe event that one <strong>of</strong> the following conflicts with another, the decision as to which shallgovern will be decided by the Engineer-<strong>of</strong>-Record, whose judgment will be final.B. When no reference is made to a code, standard, or specification, the standard specifications<strong>of</strong> ASTM (American Society <strong>of</strong> Testing Materials), the ANSI (American National StandardInstitute), the ASME (American Society <strong>of</strong> Mechanical Engineers), the IEEE (Institute <strong>of</strong>Electrical and Electronics Engineers, Inc.), or the NEMA (National Electrical ManufacturersAssociation) shall govern.END OF SECTION01010 - 1Summary.01010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!