11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(b)The Contractor further acknowledges that he assumes all risk contingent upon thenature <strong>of</strong> the subsurface conditions actually encountered by him in per<strong>for</strong>ming thework covered by the Contract, even though such actual conditions may result in theContractor per<strong>for</strong>ming more or less work than he originally anticipated.C. Utilities1. The Contractor shall be responsible <strong>for</strong> determining, at his cost, the locations <strong>of</strong> all utilitieswithin the project area, and shall be responsible <strong>for</strong> contacting each utility <strong>for</strong> location andnotification prior to commencing work.1.06 PROTECTION OF EXISTING UTILITIESA. Contractor's Responsibility <strong>for</strong> Utility Properties and Service1. Where the Contractor's operations could cause damage or inconvenience to telephone,television, power, water, or sewer systems, the operations shall be suspended until allarrangements necessary <strong>for</strong> the protection <strong>of</strong> these utilities and services have been madeby the Contractor with the owner <strong>of</strong> the utility affected.2. Notify all utility <strong>of</strong>fices which are affected by the construction operation at least 48 hours inadvance. Under no circumstances expose any utility without first obtaining permission fromthe appropriate agency. Once permission has been granted, locate, expose, and providetemporary support <strong>for</strong> all existing underground utilities.3. The Contractor shall be solely and directly responsible to the Owner and operators <strong>of</strong> suchproperties <strong>for</strong> any damage, injury, expense, loss, inconvenience, delay, suits, actions, orclaims <strong>of</strong> any character brought because <strong>of</strong> any injuries or damage which may result fromthe construction operations under this Contract.4. Neither the Owner nor its <strong>of</strong>ficers or agents shall be responsible to the Contractor<strong>for</strong> damages as a result <strong>of</strong> the Contractor's failure to protect utilities encountered inthe work.5. In the event <strong>of</strong> interruption to domestic water, sewer, storm drain, or other utilityservices as a result <strong>of</strong> accidental breakage due to construction operations,promptly notify the proper authority. Cooperate with said authority in restoration <strong>of</strong>service as promptly as possible and bear all costs <strong>of</strong> repair. In no case shallinterruption <strong>of</strong> any water or utility service be allowed to exist outside working hoursunless prior approval is granted.6. In the event the Contractor encounters sanitary service or water service lines thatinterfere with trenching, he may, by obtaining prior approval <strong>of</strong> the property owner,<strong>City</strong> or Fire Department as applicable, and the Engineer, cut the service, digthrough, and restore the service with similar and equal materials at the Contractor'sexpense.7. The Contractor shall replace in kind, at his own expense, all existing utilities orstructures removed or damaged during construction, unless otherwise provided <strong>for</strong>in these Contract documents or ordered by the Engineer.B. Interfering Structures1. Take necessary precautions to prevent damage to existing structures whether onthe surface, aboveground, or underground.Maintenance & Protection <strong>of</strong> Properties Section 01020-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!