1.10 WATER CONTROL:A. Grade site to drain. Maintain excavations free <strong>of</strong> water. Provide, operate and maintain pumpingequipment. Contractor responsible <strong>for</strong> obtaining any required South Florida Water ManagementDistrict dewatering permits.B. Protect site from puddling or running water.1.11 TEMPORARY BYPASSING FACILITIES:Contractor to provide all pumps, labor and materials required to bypass the flow <strong>of</strong> sewage duringsewer main replacement, manhole work, and lift station modifications.1.12 PROTECTION OF INSTALLED WORK:A. Protect installed Work and provide special protection where specified in individual specificationsections.B. Provide temporary and removable protection <strong>for</strong> installed Products. Control activity in immediatework area to prevent damage.1.13. SECURITY:Provide security and facilities to protect Work, existing facilities and Owner's operations fromunauthorized entry, vandalism or theft.1.14 PROGRESS CLEANING AND WASTE REMOVAL:A. Maintain areas free <strong>of</strong> waste materials, debris and rubbish. Maintain site in a clean and orderlycondition.B. Collect and remove waste materials, debris and rubbish from site daily and dispose <strong>of</strong>f-site.1.15 REMOVAL OF UTILITIES, FACILITIES AND CONTROLS:A. Remove temporary utilities, equipment, facilities and materials prior to Substantial Completioninspection.B. Clean and repair damage caused by installation or use <strong>of</strong> temporary work.C. Restore existing (and permanent) facilities used during construction to original condition. Restorepermanent facilities used during construction to specified condition.1.16 TEMPORARY WATER SERVICES:See Section 01019-2, Paragraph 1.06.PART 2 PRODUCTSPART 3 EXECUTIONNOT APPLICABLENOT APPLICABLEEND OF SECTIONConstruction Facilities & Temporary Controls Section 01501-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!