11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Occupancy permits, operating certificates, test certificates and similar releasesenabling the Owner's full and unrestricted use <strong>of</strong> the work and access to servicesand utilities.4. Record drawings, maintenance manuals, project photographs, property surveyand similar record in<strong>for</strong>mation.5. Tools, spare parts, extra stocks <strong>of</strong> materials and similar physical items to theOwner.6. Certification that all site temporary facilities and services, along with constructionequipment, mock-ups and similar elements have been removed from the site andthat all repairs, touch-ups and restorations <strong>of</strong> marred exposed finishes have beencompleted.B. Within a reasonable time after receipt <strong>of</strong> such notice, the Engineer will make aninspection to determine the status <strong>of</strong> completion.C. Should the Engineer determine that the Work is not substantially complete:1. The Engineer will promptly notify the Contractor in writing, giving the reasonsthere<strong>for</strong>e.2. The Contractor will remedy the deficiencies in the Work, and send a secondwritten notice <strong>of</strong> substantial completion to the Engineer.3. The Engineer will then re-inspect the Work.D. When the Engineer finds that the Work is substantially complete, it will:1. Prepare and deliver to the Owner a tentative Certificate <strong>of</strong> SubstantialCompletion, with a tentative list <strong>of</strong> items to be completed or corrected be<strong>for</strong>e finalpayment.2. After consideration <strong>of</strong> any objections made by the Owner as provided in theGeneral Conditions, and when the Engineer considers the Work substantiallycomplete, it will execute and deliver to the Owner and the Contractor a definiteCertificate <strong>of</strong> Substantial Completion with a revised tentative list <strong>of</strong> items to becompleted or corrected.1.05 FINAL SUBMITTALSA. The following submittals, as applicable, are required prior to finalizing the Contract:1. Final shop drawings.2. Record drawings.B. All guarantees, bonds, certifications, licenses, and affidavits required <strong>for</strong> work andequipment must be filed with the Engineer.1.06 RELEASE OF LIENS OR CLAIMSSatisfactory evidence <strong>of</strong> release or waiver <strong>of</strong> all liens or claims must be submitted to theOwner prior to finalizing the Contract.Project Closeout Section 01700-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!