11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

C. At Contract closeout, submit documents with transmittal letter containing date, projecttitle, Contractor's name and address, list <strong>of</strong> documents and signature <strong>of</strong> Contractor.D. Drawings legibly marked to record actual construction and showing:1. Horizontal and vertical locations <strong>of</strong> underground utilities and appurtenances.2. Field changes <strong>of</strong> dimension and detail.3. Changes made by approved Field Order or by approved Change Order.4. Details not shown on original Contract Drawings.E. Specifications and Addenda with each Section legibly marked to record:1. Manufacturer, trade name, catalog number, and supplier <strong>of</strong> each product anditem <strong>of</strong> equipment furnished and installed.2. Changes made by approved Field Order or by approved Change Order.1.13 WARRANTIES AND BONDSA. Provide duplicate, signed, notarized originals. Execute Contractor's submittals andassemble documents executed by subcontractors, suppliers and manufacturers. Providetable <strong>of</strong> contents and assemble in binder with durable plastic cover.B. Submit material prior to final application <strong>for</strong> payment. For equipment put into use withOwner's permission during construction, submit within 10 days after first operation. Foritems <strong>of</strong> Work delayed materially beyond the date <strong>of</strong> Substantial Completion, provideupdated submittals within 10 days after acceptance, listing the date <strong>of</strong> acceptance as thestart <strong>of</strong> the warranty period.1.14 FINAL APPLICATION FOR PAYMENTThe Contractor will submit the Final Application <strong>for</strong> Payment in accordance with theprocedures and requirements stated in the General Conditions.1.15 FINAL CERTIFICATE FOR PAYMENTThe Engineer will process the Final Application <strong>for</strong> Payment in accordance with theprovisions <strong>of</strong> the General Conditions.1.16 POST-CONSTRUCTION INSPECTIONA. Prior to expiration <strong>of</strong> one year from the date <strong>of</strong> Substantial Completion, the Engineer willmake a visual inspection <strong>of</strong> the Project in company with the Owner and the Contractor todetermine whether correction <strong>of</strong> Work is required, in accordance with the provisions <strong>of</strong>the General Conditions.B. The Engineer will promptly notify the Contractor, in writing, <strong>of</strong> any observed defects ordeficiencies in the work.C. The Contractor shall immediately undertake all work required to remedy defects andrepair the work to the satisfaction <strong>of</strong> the Engineer and the Owner.Project Closeout Section 01700-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!