11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SECTION 01210SAFETY AND CONVENIENCEPART 1 – GENERAL1.01 SAFETY EQUIPMENTA. The Contractor shall do all work necessary to protect the general public from hazards,including, but not limited to, surface irregularities or unramped grade changes in pedestriansidewalk or walkway, and trenches or excavations in roadway. Barricades, lanterns, andproper signs shall be furnished in sufficient amount to safeguard the public and the work. Allbarricades and signs shall be clean and serviceable, in the opinion <strong>of</strong> the Engineer.B. During construction, the Contractor shall construct and at all times maintain satisfactory andsubstantial temporary chain link fencing, solid fencing, railing, barricades or steel plates, asapplicable, at all openings, obstructions, or other hazards in streets, sidewalks, floor, ro<strong>of</strong>s,and walkways. All such barriers shall have adequate warning lights as necessary, or required,<strong>for</strong> safety. All lights shall be regularly maintained, and in a fully operational state at all times.C. All work shall con<strong>for</strong>m to the Trench Safety Act. Contractor shall include in his price the cost<strong>of</strong> con<strong>for</strong>ming to the Trench Safety Act.1.02 ACCIDENT REPORTSA. In addition, the Contractor must promptly report in writing to the Engineer all accidentswhatsoever arising out <strong>of</strong>, or in connection with, the per<strong>for</strong>mance <strong>of</strong> the work whether on, oradjacent to, the site, giving full details and statements <strong>of</strong> witnesses. If death or seriousinjuries or serious damages are caused, the accident shall be reported immediately bytelephone or messenger to the Engineer.B. If a claim is made by anyone against the contractor or any subcontractor on account <strong>of</strong> anyaccident, the Contractor shall promptly report the facts in writing to the Engineer, giving fulldetails <strong>of</strong> the claim.1.03 PROTECTION AND ACCESS TO PRIVATE PROPERTYA. Protect stored materials located adjacent to the proposed work. Notify property ownersaffected by the construction at least 24 hours in advance <strong>of</strong> the time construction begins.During construction operations, construct and maintain such facilities as may be required toprovide access by all property owners to their property. No person shall be cut <strong>of</strong>f fromvehicular access to his residence or place <strong>of</strong> business <strong>for</strong> a period exceeding 2 hours, unlessthe Contractor has made special arrangements with the affected persons.B. The Contractor shall conduct his work zone in such a manner as to reasonably exclude allpersonnel not employed by him, the Engineer, and the Owner.1.04 FIRE PREVENTION AND PROTECTIONA. The Contractor shall per<strong>for</strong>m all work in a fire-safe manner. He shall supply andmaintain on the site adequate fire-fighting equipment capable <strong>of</strong> extinguishingincipient fires. The Contractor shall comply with applicable federal, state and localfire-prevention regulations. Where these regulations do not apply, applicable parts <strong>of</strong>the National Fire Prevention Standard <strong>for</strong> Safeguarding Building ConstructionOperations (NFPA No. 24l) shall be followed.Safety and Convenience Section 01210-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!