1.07 CONTRACT ADJUSTMENTS:Contract Sum adjustments will be by Change Order on basis <strong>of</strong> net accumulative change <strong>for</strong> each unitprice category.A. Except as otherwise specified, unit prices shall apply to both deductive and additivevariations <strong>of</strong> quantities.B. Unit prices in the Agreement shall remain in effect until date <strong>of</strong> final completion <strong>of</strong> the entireWork.1.08 DEFECT ASSESSMENT:A. Replace the Work, or portions <strong>of</strong> the Work, not con<strong>for</strong>ming to specified requirements.1.09 NON-PAYMENT FOR REJECTED PRODUCTS:A. Payment will not be made <strong>for</strong> any <strong>of</strong> the following:1. Products wasted or disposed <strong>of</strong> in a manner that is not acceptable.2. Products determined as unacceptable be<strong>for</strong>e or after placement.3. Products not completely unloaded from the transporting vehicle.4. Products placed beyond the lines and levels <strong>of</strong> the required Work.5. Products remaining on hand after completion <strong>of</strong> the Work.6. Loading, hauling and disposing <strong>of</strong> rejected Products.7. Used Products and Materials.PART IIPRODUCTSNot Used.PART IIIEXECUTION3.01 MEASUREMENT:A. Each building shall be paid on a lump sum basis. This includes all work as shown on the plansand specified herein. Contractor shall submit schedule <strong>of</strong> values <strong>of</strong> each station <strong>for</strong> paymentapplication processing.B. Building Permit Fees shall be calculated using the <strong>for</strong>mula <strong>of</strong> paragraph 3.02.C. Mobilization: Lump sum amount to include costs <strong>for</strong> mobilization.3.02 BUILDING PERMIT FEES:Bidder shall be responsible <strong>for</strong> payment <strong>of</strong> all Building Permit Fees associated with the Work. TheBuilding Permit Fees shall be calculated per the schedule attached and shall be based on the entireproject, including both base bid items and all Additive Alternates. The Building Permit Fees shall beincluded as part <strong>of</strong> the Total Base Bid.01025 - 2Measure and Payment

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!