1.10 FINAL ADJUSTMENT OF ACCOUNTSA. Submit a final statement <strong>of</strong> accounting to the Engineer. The statement will reflect allapproved adjustments to the Contract Sum, including:1. The original Contract Sum.2. Additions and deductions resulting from:a. Approved Change Orders.b. Allowances.c. Unit Prices.d. Deductions <strong>for</strong> uncorrected Work.e. Deductions <strong>for</strong> liquidated damages.f. Deductions <strong>for</strong> re-inspection payments.g. Deductions <strong>for</strong> re-testing due to failed tests.h. Other adjustments.3. Total Contract Sum, as adjusted.4. Previous payments.5. Sum remaining due.B. The Engineer will prepare a final Change Order, reflecting approved adjustments to theContract Sum which were not previously made by Change Order.1.11 FINAL CLEANINGA. Per<strong>for</strong>m prior to final inspection.B. Clean the site, sweep paved areas, rake clean other surfaces.C. Remove waste and surplus materials, rubbish and construction facilities from the projectsite and dispose <strong>of</strong> in a lawful manner.D. Remove stains, petrochemical spills and other <strong>for</strong>eign deposits.E. Except as otherwise indicated or requested by the Owner, remove temporary protectiondevices and facilities installed during the course <strong>of</strong> the Work to protect previouslycompleted Work during the remainder <strong>of</strong> the construction period.F. Comply with safety standards and governing regulations <strong>for</strong> cleaning operations. Do notburn waste materials at the site or bury debris or excess materials, or discharge volatileor other harmful or dangerous materials into the environment.G. Where extra materials <strong>of</strong> value remain after completion <strong>of</strong> the Work, dispose <strong>of</strong> or storesuch materials <strong>for</strong> use by the Owner as indicated in these Specifications.1.12 PROJECT RECORD DOCUMENTSA. Store documents separate from those used <strong>for</strong> construction.B. Keep documents current. Do not permanently conceal any work until required in<strong>for</strong>mationhas been recorded.Project Closeout Section 01700-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!