SECTION 01700PROJECT CLOSEOUTPART 1 - GENERAL1.01 REQUIREMENTS INCLUDEDA. Closeout procedures, final cleaning, project record documents, system demonstration,warranties and bonds.B. Closeout includes the general requirements near the end <strong>of</strong> the Contract Time inpreparation <strong>for</strong> final acceptance, final payment, normal termination <strong>of</strong> the Contract,beneficial use by the Owner, and similar actions evidencing completion <strong>of</strong> the Work.1.02 RELATED REQUIREMENTSA. Section 01010: Summary <strong>of</strong> Work.B. Section 01050: Field Engineering.C. Section 01500: Construction Considerations.1.03 CLOSEOUT PROCEDURESA. Comply with procedures stated in the General Conditions <strong>of</strong> the Contract Documents <strong>for</strong>issuance <strong>of</strong> the Certificate <strong>of</strong> Substantial Completion and the Certificate <strong>of</strong> FinalCompletion.B. When the Contractor considers that the Work has reached final completion, submitwritten certification that the Contract Documents have been reviewed, the Work has beenthoroughly inspected, and that the Work is considered to be completed in accordancewith the Contract Documents and is ready <strong>for</strong> inspection by the Engineer.C. In addition to submittals required by the conditions <strong>of</strong> the Contract, provide all othersubmittals required by the Owner, other governing authorities or regulatory agencies, andsubmit to the Engineer a final statement <strong>of</strong> accounting giving the total adjusted ContractSum, previous payments, and the sum remaining due.D. The Engineer will issue a final change order reflecting approved adjustments to theContract Sum not previously made by Change Order.1.04 SUBSTANTIAL COMPLETIONA. When the Contractor considers the Work to be substantially complete, the Contractor willsubmit to the Engineer, or the Owner, as applicable:1. A written notice that the Work, or a designated portion there<strong>of</strong>, is substantiallycomplete.2. Special guarantees, warranties, workmanship bonds, maintenance agreementsand similar documents.Project Closeout Section 01700-1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!