11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

work until satisfactory corrective action has been taken. No part <strong>of</strong> the time lost due toany such stop orders shall be made the subject <strong>of</strong> a claim <strong>for</strong> extension <strong>of</strong> time or <strong>for</strong>excess costs or damages by the CONTRACTOR unless it is later determined that theCONTRACTOR was in compliance.1.04 IMPLEMENTATIONA. Prior to commencement <strong>of</strong> the Work, meet with the ENGINEER to develop mutualunderstandings relative to compliance with this provision and administration <strong>of</strong> theenvironmental pollution control program.B. Remove temporary environmental control features, when approved by the ENGINEERand incorporate permanent control features into the project at the earliest practicabletime.PART 2 - PRODUCTS (NOT USED)PART 3 - EXECUTION3.01 EROSION CONTROLA. Provide positive means <strong>of</strong> erosion control such as shallow ditches around construction tocarry <strong>of</strong>f surface water. Erosion control measures, such as siltation basins, hay checkdams, mulching, jute netting and other equivalent techniques, shall be used asappropriate. Flow <strong>of</strong> surface water into excavated areas shall be prevented. Ditchesaround construction areas shall also be used to carry away water resulting fromdewatering <strong>of</strong> excavated areas. At the completion <strong>of</strong> the work, ditches shall be backfilledand the ground surface restored to its original condition.3.02 PROTECTION OF SURFACE WATERSA. Care shall be taken to prevent, or reduce to a minimum, any damage to any surfacewater from pollution by debris, sediment or other material, or from the manipulation <strong>of</strong>equipment and/or materials in or near such surface waters. Water that has been used <strong>for</strong>washing or processing, or that contains oils or sediments that will reduce the quality <strong>of</strong>the surface water, shall not be directly returned to the surface water. Such waters will bediverted through a settling basin or filter be<strong>for</strong>e being directed into the surface waters.B. The CONTRACTOR shall not discharge water from testing operations directly into anysurface water.C. All preventative measures shall be taken to avoid spillage <strong>of</strong> petroleum products andother pollutants. In the event <strong>of</strong> any spillage, prompt remedial action shall be taken inaccordance with a contingency action plan approved by the OWNER. CONTRACTORshall submit two copies <strong>of</strong> approved contingency plans to the ENGINEER3.03 PROTECTION OF LAND RESOURCESA. Land resources within the project boundaries and outside the limits <strong>of</strong> permanent workshall be restored to a condition, after completion <strong>of</strong> construction, that will appear to beEnvironmental Protection Procedures Section 01110-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!