11.07.2015 Views

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

TECHNICAL SPECIFICATIONS for - City of West Palm Beach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.07 FINAL INSPECTIONA. When the Contractor considers the Work complete, it will submit written certification that:1. The Contract Documents have been reviewed.2. The Work has been inspected <strong>for</strong> compliance with the Contract Document.3. The Work has been completed in accordance with the Contract Documents.4. The Work is in every way completed and ready <strong>for</strong> final inspection.B. The Engineer will make an inspection to verify the status <strong>of</strong> completion with reasonablepromptness after receipt <strong>of</strong> such certification.C. Should the Engineer consider that the Work is incomplete or defective:1. The Engineer will promptly notify the Contractor in writing, listing the incompleteor defective work.2. The Contractor will take immediate steps to remedy the stated deficiencies, andsend a second written certification to the Engineer that the Work is complete.3. The Engineer will re-inspect the work.4. When the Engineer finds that the Work is acceptable under the ContractDocuments, it shall request the Contractor to make close-out submittals.1.08 REINSPECTION FEESA. Should the Engineer per<strong>for</strong>m re-inspections due to the failure <strong>of</strong> the Work to comply withthe claims <strong>of</strong> status <strong>of</strong> completion made by the Contractor:1. The Contractor will compensate the Engineer <strong>for</strong> such additional services.2. The Owner will deduct the costs <strong>of</strong> such additional compensation from the finalpayment to the Contractor.1.09 CONTRACTOR'S CLOSE-OUT SUBMITTALS TO THE ENGINEERA. Project record drawings.B. Contractor's affidavit <strong>of</strong> payment <strong>of</strong> debts and claims:1. Contractor's release or waiver <strong>of</strong> liens.C. Separate releases or waivers <strong>of</strong> liens <strong>for</strong> subcontractors, suppliers and others that havefiled lien rights against property <strong>of</strong> the Owner in accordance with Section 713.06 FloridaStatutes, together with a list <strong>of</strong> those parties.D. Final payment request with Consent <strong>of</strong> Surety <strong>for</strong> Final Payment and the Contractor'sCertification <strong>of</strong> Final Completion.E. Certified copy <strong>of</strong> the Engineer's final punch-list <strong>of</strong> itemized work to be completed orcorrected, stating that each item has been completed or otherwise resolved <strong>for</strong>acceptance.Project Closeout Section 01700-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!