B. It is the responsibility <strong>of</strong> the Contractor to ensure that all utility or other poles, the stability <strong>of</strong>which may be endangered by the close proximity <strong>of</strong> excavation, are temporarily stayed inposition while the work proceeds in the vicinity <strong>of</strong> the pole and that the utility or othercompanies concerned be given reasonable advance notice <strong>of</strong> any such excavation by theContractor.1.20 CLEAN-UP:The Contractor shall maintain the site <strong>of</strong> the work in a neat condition. The Contractor shall remove allexcess materials, excess excavated materials and all debris resulting from his operations within atime frame approved by the Engineer.1.21 DESIGN PROFESSIONALS REPRESENTING OWNER:Various Design Pr<strong>of</strong>essionals (i.e. Civil, Mechanical, Electrical, Groundwater Hydrologists, etc.) asconsultants to the Owner prepared the drawings and specifications <strong>for</strong> the project. The Owner mayhave the various Design Pr<strong>of</strong>essionals provide services to the Owner during construction phase <strong>of</strong> theproject. The Design Pr<strong>of</strong>essionals will be representatives <strong>of</strong> the Owner and visits to the site by theDesign Pr<strong>of</strong>essionals will be on the basis <strong>of</strong> paragraph 1.22 <strong>of</strong> this section. Also paragraph 1.23 <strong>of</strong>this section includes the various Design Pr<strong>of</strong>essionals <strong>for</strong> this project.1.22 VISITS TO SITE BY OWNER'S REPRESENTATIVE:The Owner's representative will make visits to the site at intervals appropriate to the various stages <strong>of</strong>construction to observe the progress and quality <strong>of</strong> the executed work and to determine, in general, ifthe work is proceeding in accordance with the Contract Documents.The Owner's representative's ef<strong>for</strong>ts will be directed toward providing <strong>for</strong> the Owner a greater degree<strong>of</strong> confidence that the completed work will con<strong>for</strong>m to the drawings and these specifications. On thebasis <strong>of</strong> such visits and on-site observations, the Owner's representative will keep the Owner in<strong>for</strong>med<strong>of</strong> the progress <strong>of</strong> the work and will endeavor to guard the Owner against defects and deficiencies inthe work.1.23 LIMITATIONS ON OWNER'S REPRESENTATIVE RESPONSIBILITIES:A. Neither the Owner's representative's authority to act under these specifications and drawingsor elsewhere in other documents nor any decision made by the Owner's representative ingood faith either to exercise or not exercise such authority shall give rise to any duty orresponsibility <strong>of</strong> the Owner's representative to the Contractor, any sub-Contractor, anymanufacturer, fabricator, supplier or distributor, or any <strong>of</strong> their agents or employees or anyother person per<strong>for</strong>ming any <strong>of</strong> the work.B. The Owner's representative shall not be responsible to the Contractor's means, methods,techniques, sequences or procedures <strong>of</strong> construction, or safety precautions and programsincident thereto, and the Owner's representative shall not be responsible <strong>for</strong> the Contractor'sfailure to per<strong>for</strong>m the work in accordance with the drawings and these specifications.C. The Owner's representative shall not be responsible <strong>for</strong> the acts or omissions <strong>of</strong> theContractor or <strong>of</strong> any sub-Contractors, or <strong>of</strong> any other persons at the site or otherwiseper<strong>for</strong>ming any <strong>of</strong> the work.1.24 WARRANTY:The Contractor shall be responsible <strong>for</strong> defects in materials (including latent defects) or workmanship<strong>for</strong> a period <strong>of</strong> one year after the date <strong>of</strong> final acceptance <strong>of</strong> the project by the Owner. Such defectsinclude, but not limited to, any settlement noted in backfill, fill, or in structures built over the backfill orfill during the warranty period in accordance with the GENERAL CONDITIONS will be considered tobeGeneral Requirements Section 01019-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!