12.07.2015 Views

Minnegang Creek Flood Study Report - Wollongong City Council

Minnegang Creek Flood Study Report - Wollongong City Council

Minnegang Creek Flood Study Report - Wollongong City Council

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Time Rain(mm)Time Rain(mm)Time Rain(mm)Time Rain(mm)Time Rain(mm)22:50 0 0:55 0 3:00 2 5:05 0.5 7:10 022:55 0 1:00 0 3:05 0.5 5:10 0 7:15 023:00 0 1:05 0 3:10 1 5:15 0 7:20 023:05 0.5 1:10 0 3:15 0.5 5:20 0 7:25 023:10 0 1:15 0 3:20 1 5:25 0 7:30 123:15 0 1:20 0.5 3:25 0.5 5:30 0 7:35 0.523:20 0 1:25 0 3:30 0.5 5:35 0.5 7:40 123:25 0 1:30 0.5 3:35 0.5 5:40 0.5 7:45 0.523:30 0 1:35 0.5 3:40 1 5:45 0.5 7:50 123:35 0 1:40 0.5 3:45 0.5 5:50 0.5 7:55 123:40 0 1:45 0 3:50 1 5:55 0 8:00 0.523:45 0 1:50 1 3:55 1 6:00 0.5 8:05 123:50 0 1:55 1 4:00 2 6:05 0 8:10 0.523:55 0 2:00 1 4:05 1 6:10 1 8:15 0.50:00 0 2:05 0 4:10 1 6:15 0.5 8:20 00:05 0 2:10 0 4:15 0 6:20 1 8:25 00:10 0.5 2:15 1 4:20 1 6:25 0 8:30 0.50:15 0 2:20 0.5 4:25 0.5 6:30 0.5 8:35 00:20 0 2:25 0.5 4:30 2.5 6:35 0 8:40 00:25 0.5 2:30 0.5 4:35 1 6:40 0 8:45 00:30 0.5 2:35 0.5 4:40 1 6:45 0 8:50 00:35 0 2:40 1 4:45 1 6:50 0.5 8:55 00:40 0 2:45 0.5 4:50 0.5 6:55 0.5 9:00 0.50:45 0.5 2:50 0.5 4:55 1 7:00 0 9:05 00:50 0 2:55 1 5:00 0.5 7:05 0.5 TOTAL 205 mmRUNOFF HYDROGRAPH - 17 AUGUST 1998 CALIBRATION EVENTA plot of the runoff hydrograph for this event at the downstream extent of <strong>Minnegang</strong> <strong>Creek</strong> is shownbelow. This was determined from the RAFTS model of the catchment.0.80.70.6Runoff Hydrograph: 17 - 18 August 1998 Calibration EventFlow (m3/s)0.50.40.30.20.107:00 9:00 11:00 13:00 15:00 17:00 19:00 21:00 23:00 1:00 3:00 5:00 7:00 9:00 11:00Time (hrs)SV8507-DO-001 Rev 2 C-318/10/02

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!