12.07.2015 Views

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Capability</strong> Dimension67Generic Goals• CL 0 - No goal.• CL 1 - GG 1: The process supports and enablesachievement of the specific goals of the process area bytransforming identifiable input work products to produceidentifiable output work products.• CL 2 - GG 2: The process is institutionalized as amanaged process.• CL 3 - GG 3: The process is institutionalized as adefined process.• CL 4 - GG 4: The process is institutionalized as aquantitatively managed process.• CL 5 - GG 5: The process is institutionalized as anoptimizing process.6834

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!