7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee
7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee
7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Capability</strong> Dimension67Generic Goals• CL 0 - No goal.• CL 1 - GG 1: The process supports and enablesachievement of the specific goals of the process area bytransforming identifiable input work products to produceidentifiable output work products.• CL 2 - GG 2: The process is institutionalized as amanaged process.• CL 3 - GG 3: The process is institutionalized as adefined process.• CL 4 - GG 4: The process is institutionalized as aquantitatively managed process.• CL 5 - GG 5: The process is institutionalized as anoptimizing process.6834