12.07.2015 Views

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Expected Materials• The only expected component of the <strong>CMMI</strong> models isthe statement of a "practice."• A practice represents the "expected" means of achievinga goal.• Every practice in the <strong>CMMI</strong> models is mapped to exactlyone goal.• A practice is not a required component, however; aspecific organization may possess demonstrated meansof achieving a goal that do not rely on the performanceof all the practices that are mapped to that goal.– That is, "alternative" practices may provide an equally useful wayof reaching the goal.85Expected Materials• When a practice is unique to a singleprocess area, it is called a "specificpractice" (SP).• When a practice may apply across all ofthe process areas, it is called a "genericpractice" (GP).8643

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!