12.07.2015 Views

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CMMI</strong> transition project: Schedule• Consider the following guidelines:– Making the transition to <strong>CMMI</strong> is like implementing othercultural changes in an organization;• the further the starting point on the journey, the longer the trip willtake.– Based on SEI measurements on implementing the CMM forSoftware, organizations with little existing infrastructures orexperience with process improvement projects typically require18 to 24 months to reach maturity level 2.• To reach maturity level 3 typically requires an additional 12months.– Organizations at higher maturity or capability levels in softwareand systems engin<strong>ee</strong>ring will probably require one year,depending upon the current measurement programs and thenumber of new processes that n<strong>ee</strong>d to be developed androlled out.• Typically, new processes take at least six months to be rolled outin an organization.105<strong>CMMI</strong> as an Enterprise Process-Improvement Framework53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!