12.07.2015 Views

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

7. Capability Maturity Model Integration (CMMI) - tud.ttu.ee

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Specific Practices Associated withSpecific Goals• Specific Goal– REQM SG 1:Requirements aremanaged andinconsistencies withproject plans and workproducts are identified.• Specific Practice– REQM SP 1.1-1:Develop anunderstanding with therequirementsproviders on themeaning of therequirements.87Specific Practices Associated withSpecific Goals• Specific Goal– PMC SG 2: Correctiveactions are managedto closure when theproject's performanceor results deviatesignificantly from theplan.• Specific Practice– PMC SP 2.1-1: Collectand analyze the issuesand determine thecorrective actionsnecessary to addressthe issues.8844

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!