Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MOUNTING SCOPE1. Identify front of base (fig. 27) (Screwsshould be on right side). Front shouldface the <strong>HTI</strong> muzzle.2. Loosen and remove ring top screws,also loosen the ring base screws but itis not necessary to remove them completely.Figure 273. Tilt base on right side, placing dove tailcatch under picatinny rail (fig. 28).4. Rotate base until flat on top of picatinnyrail. (Ensure left dove tail goesunder rail)5. Tighten base screws to 80 inch lb..Figure 2829