12.07.2015 Views

Installation Manual HLF-25, 30, 40, & 50 - Waltco

Installation Manual HLF-25, 30, 40, & 50 - Waltco

Installation Manual HLF-25, 30, 40, & 50 - Waltco

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 7 FINAL INSPECTION SHEETIMPORTANT:All of the following are to be checked and verifiedbefore installation is complete.A. Are all pivot pins secured with retaining boltand lock washer?B. Are all roll pins securely in place?C. Does liftgate fold and unfold properly?D. Does the platform meet the vehicleproperly?P. Are all decals properly in place and legibleaccording to the decal placement drawings?Q. Is pump cover installed and securelylatched?R. Is the owner’s manual in the vehicle?S. Are 3/16” coil pin shims removed fromplatform?E. Do controls operate properly?F. Are bed extension, mount frame, mountplates, dock bumpers, bumper braces,taillight guards and taillights all finishwelded?G. Are hydraulic hoses and fittings properlyconnected with no leaks?H. Is battery cable attached and clampedtight?I. Is circuit breaker installed at battery?J. Are all electrical connections coated withdielectric grease?K. Has hydraulic system been properly bledof all air?L. Is pump reservoir full of oil and capped withbreather plug?M. Are all parts properly lubricated accordingto the lubrication instructions?N. Do lights operate properly(Note: Lights must be installed inaccordance with all applicable stateand federal D.O.T. regulations)O. Is license plate properly installed?WARNING:Do not use liftgate if any of the above are notchecked and verified. If you have any questionsnot covered in this manual, contact your nearest<strong>Waltco</strong> distributor, or the nearest <strong>Waltco</strong> factory.Page 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!