12.07.2015 Views

Installation Manual HLF-25, 30, 40, & 50 - Waltco

Installation Manual HLF-25, 30, 40, & 50 - Waltco

Installation Manual HLF-25, 30, 40, & 50 - Waltco

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Auxiliary Battery Kit w/Dual Cables 80101569DETERMINE BATTERY LOCATION AND CABLEROUTINGDetermine where auxiliary battery box will be mountedon the vehicle.For trucks your installation will use cables supplied withliftgate.For trailers additional cables are supplied with the trailerkit.PumpAuxiliaryBatteriesVehicleBatteriesPumpAuxiliaryBatteriesGR02768Locate battery box in a suitable location under thevehicle body.Weld hanger channel to body crossmembers.Install batteries into box.Body CrossmembersBatteryBoxHangerChannelGR02769Install #1 ga. power and ground cables to liftgate pumpunit per liftgate instructions.Route cables along chassis frame towards auxiliarybattery box, securing them every 24” with cable tiesprovided.Do not connect any cables to batteries at this time.Be certain cables are protected withgrommets when passing through metalholes or over sharp edges.Page 39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!