12.07.2015 Views

Installation Manual HLF-25, 30, 40, & 50 - Waltco

Installation Manual HLF-25, 30, 40, & 50 - Waltco

Installation Manual HLF-25, 30, 40, & 50 - Waltco

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Auxiliary Battery Kit w/Dual Cables 80101569Trailer applications:Using 0 ga. cable, supplied with trailer kit, cut two (2)lengths to reach from auxiliary batteries to nose oftrailer.Install compression cable lugs as shown earlier.For trailer applications.Install dual pole socket in nose of trailer. Drill 1-3/4”hole in trailer and mount with hardware provided.Route cables from auxiliary batteries to nose of trailer.Install cables to socket as shown.IMPORTANT: Be sure to orientate cables as shown,power (+) to the left, ground (-) to theright.Attach Power (+)Cable This SideDual Pole SocketPower (charge) cable from tractor batteriesto trailer must also be protected with a 1<strong>50</strong>amp circuit breaker at the tractor batteries.Attach Ground (-)Cable This SideCables made from0 ga. cableGR02770EO6663Rev 029-8-11Page 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!