12.07.2015 Views

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BITRE | Waterline 44Figure 1.3 Brisbane: l<strong>and</strong>side <strong>of</strong> container terminal size <strong>of</strong> task indicators250221Counts (thousnds)200150100181126 133 133 121138 146 169 176 19620373 76 72 6777 80 14 17 12 11 11 13500Total containers by roadTEUs by roadTotal trucks processedSeptember 06 December 06 March 07June 07 September 07 December 07Total containers by railFigure 1.4 Brisbane: adjusted vehicle booking system usage 2007100908070Slots used (per cent)6050403020100March quarter 2007June quarter 2007 September quarter 2007 December quarter 2007Night Day Evening Saturday SundaySydneyThe Sydney (DP World, Patrick) average container turnaround time increased from41.0 minutes in the September quarter 2007 to 42.8 minutes in the December quarter2007. The truck turnaround time increased from 47.4 minutes in the September quarter2007 to 49.4 minutes in the December quarter 2007. The number <strong>of</strong> trucks processedincreased by 7.9 per cent from the September to the December quarters 2007 <strong>and</strong> thetotal TEUs increased by 9.4 per cent. Over the same period total containers movedincreased by 7.7 per cent.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!