12.07.2015 Views

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

BITRE | Waterline 44Figure 1.7 Melbourne: l<strong>and</strong>side <strong>of</strong> container terminal size <strong>of</strong> task indicators600500493Counts (thous<strong>and</strong>s)400300200285 295 284 277304336345 352 420 408450160 160 179 171 190 203 25 26 26 25 20 121000Total containers by roadTEUs by roadTotal trucks processedSeptember 06 December 06 March 07June 07 September 07 December 07Total containers by railFigure 1.8 Melbourne: adjusted vehicle booking system usage 2007100908070Slots used (per cent)60504030AdelaideThe Adelaide (DP World) average container turnaround time decreased from 32.1minutes in the September quarter 2007 to 26.3 minutes in the December quarter2007. The truck turnaround time decreased from 50.2 minutes in the Septemberquarter 2007 to 41.5 minutes in the December quarter 2007. The total number <strong>of</strong>trucks processed decreased by 0.5 per cent form the September to the quartersDecember 2007 <strong>and</strong> the total TEUs increased by 1.3 per cent. Over the same periodtotal containers moved increased by 0.8 per cent.620100March quarter 2007June quarter 2007September quarter 2007Night Day Evening Saturday SundayDecember quarter 2007

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!