12.07.2015 Views

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

PDF: 1352 KB - Bureau of Infrastructure, Transport and Regional ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 3 | Port interface cost indexTable 3.3Port <strong>and</strong> related charges for ships in the 35 000–40 000 GTrange, 2007Brisbane Sydney Melbourne Adelaide FremantleJan–Jun Jul–Dec Jan–Jun Jul–Dec Jan–Jun Jul–Dec Jan–Jun Jul–Dec Jan–Jun Jul–Dec2007 2007 2007 2007 2007 2007 2007 2007 2007 2007Ship–based charges ($/TEU)Conservancy 5.57 4.98 – – – – 5.25 4.37 – –Tonnage – – 7.92 7.18 5.74 7.18 12.14 12.32 5.06 4.90Pilotage 15.51 13.45 2.97 2.69 4.73 2.69 4.95 4.81 1.92 1.99Towage a 11.27 9.77 5.23 4.74 5.42 4.74 17.54 16.74 12.02 11.58Mooring, unmooring 2.00 1.80 1.86 1.68 0.68 1.68 – – 0.74 0.75Berth hire b – – – – – – – – – –Total c 34.36 30.01 17.99 16.30 16.58 16.30 39.88 38.24 19.74 19.22Cargo–based charges ($/TEU)WharfageImports 28.60 28.60 67.65 89.65 37.40 39.05 63.17 64.31 53.59 56.53Exports 28.60 28.60 51.15 51.15 37.40 39.05 63.17 64.31 53.59 56.53Harbour dues 46.20 46.20 – – – – – – – –Berth charge – – – – – – – – 16.05 16.93Total port <strong>and</strong> relatedcharges ($/TEU) cLoaded imports 109.16 104.81 85.64 105.95 53.98 54.81 103.05 102.54 89.38 92.68Loaded exports 109.16 104.81 69.14 67.45 53.98 54.81 103.05 102.54 89.38 92.68Charges per ship visit ($/visit)Total ship–based charges 37 122 37 393 36 416 36 416 32 695 33 311 35 446 35 614 24 787 25 056Empty TEUs d 5 805 6 224 0 7 315 4 434 5051 0 0 3121 4 082– not applicabler. reviseda. After enquiries at all ports the number <strong>of</strong> tugs required for towage in Adelaide <strong>and</strong> Fremantle used in PICIcalculations has been revised in Waterline 43.b. Charged by stevedores <strong>and</strong> itemised separately from basic stevedoring charge.c. Components may not sum to totals due to rounding.d. Sum <strong>of</strong> wharfage, harbour dues <strong>and</strong> berth charge per empty teu, multiplied by average exchange <strong>of</strong> emptyTEUs.Note: Port <strong>and</strong> related charges are based on the parameters described in Table 3.1.Sources: BITRE estimates based on ship call data supplied by relevant port authorities/corporations, <strong>and</strong> priceschedules <strong>of</strong> relevant port authorities/corporations, towage operators <strong>and</strong> pilotage service providers.33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!