02.12.2012 Views

contract for design-build services for the design - City of Miami

contract for design-build services for the design - City of Miami

contract for design-build services for the design - City of Miami

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

� The year and month, if available, that <strong>the</strong> in<strong>for</strong>mation was compiled and <strong>the</strong><br />

name, address, and emergency telephone number <strong>of</strong> <strong>the</strong> manufacturer<br />

responsible <strong>for</strong> preparing <strong>the</strong> in<strong>for</strong>mation.<br />

19. Labor and Materials<br />

Unless o<strong>the</strong>rwise provided herein, Design-Build Firm shall provide and pay <strong>for</strong> all<br />

materials, labor, water, tools, equipment, light, power, transportation and o<strong>the</strong>r facilities<br />

and <strong>services</strong> necessary <strong>for</strong> <strong>the</strong> proper execution and completion <strong>of</strong> <strong>the</strong> Work, whe<strong>the</strong>r<br />

temporary or permanent and whe<strong>the</strong>r or not incorporated or to be incorporated in <strong>the</strong><br />

Work.<br />

Design-Build Firm shall at all times en<strong>for</strong>ce strict discipline and good order among its<br />

employees, Sub Design-Build Firm , and Subconsultant at <strong>the</strong> Project(s) site(s) and shall<br />

not employ on <strong>the</strong> Project(s) any unfit person or anyone not skilled in <strong>the</strong> Work to which<br />

<strong>the</strong>y are assigned.<br />

20. Rules, Regulations, and Licenses<br />

The successful Design-Build Firm shall comply with all laws and regulations applicable<br />

to provision <strong>of</strong> <strong>services</strong> specified in <strong>the</strong> Contract Documents. The Design-Build Firm<br />

shall be familiar with all federal, state and local laws that may in affect <strong>the</strong> goods and/or<br />

<strong>services</strong> <strong>of</strong>fered.<br />

21. Project Management<br />

Where a Design-Build Firm is awarded Work, <strong>the</strong> Design-Build Firm shall be responsible<br />

<strong>for</strong> all Project management, including any and all sub<strong>contract</strong>s necessary to ensure that<br />

<strong>the</strong> Work is per<strong>for</strong>med in accordance with <strong>the</strong> Contract Documents. Project<br />

Management shall include, but is not limited to: obtaining bids from sub<strong>contract</strong>ors and<br />

suppliers; coordinating <strong>the</strong> securing <strong>of</strong> all permits; obtaining licenses and inspections;<br />

ensuring that sub<strong>contract</strong>ors, and Subconsultants comply with all <strong>City</strong> requirements;<br />

per<strong>for</strong>ming <strong>the</strong> Work in accordance with <strong>the</strong> Contract Documents to <strong>the</strong> satisfaction <strong>of</strong><br />

<strong>the</strong> Project Manager; paying all Sub Design-Build Firm s and Subconsultants; obtaining<br />

release <strong>of</strong> liens/claims fees; and obtaining temporary and final Certificates <strong>of</strong> Occupancy<br />

or Completion.<br />

22. Superintendence and Supervision<br />

The Design-Build Firm shall keep <strong>the</strong> Contract under his own control and it shall be its<br />

responsibility to see that <strong>the</strong> Work is properly supervised and carried on faithfully and<br />

efficiently. The Design-Build Firm shall supervise <strong>the</strong> Work personally and shall have a<br />

competent, English-speaking superintendent, or representative who shall be on <strong>the</strong> site<br />

<strong>of</strong> <strong>the</strong> Project at all working hours, and who shall have full authority by <strong>the</strong> Design-Build<br />

Firm to direct <strong>the</strong> per<strong>for</strong>mance <strong>of</strong> <strong>the</strong> Work and make arrangements <strong>for</strong> all necessary<br />

materials, equipment, and labor without delay.<br />

The orders <strong>of</strong> <strong>the</strong> <strong>City</strong> are given through <strong>the</strong> Project Manager, which instructions are to<br />

be strictly and promptly followed in every case. Design-Build Firm shall keep on <strong>the</strong><br />

Project during its progress, a full-time competent English speaking superintendent and<br />

any necessary assistants, all satisfactory to Project Manager. The superintendent shall<br />

not be changed except with <strong>the</strong> written consent <strong>of</strong> Project Manager, unless <strong>the</strong><br />

superintendent proves to be unsatisfactory to Design-Build Firm and ceases to be in its<br />

employ. The superintendent shall represent Design-Build Firm and all directions given<br />

to <strong>the</strong> superintendent shall be as binding as if given to Design-Build Firm and will be<br />

confirmed in writing by Project Manager upon <strong>the</strong> written request <strong>of</strong> Design-Build Firm.<br />

Design-Build Firm shall give efficient supervision to <strong>the</strong> Work, using its best skill and<br />

20<br />

Design-Build Services <strong>for</strong> Seawall Stabilization and Repair Project RFP 11-12-033

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!