02.12.2012 Views

contract for design-build services for the design - City of Miami

contract for design-build services for the design - City of Miami

contract for design-build services for the design - City of Miami

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

signs along <strong>the</strong> detour route), traffic control, and o<strong>the</strong>r provisions, throughout <strong>the</strong><br />

Project, as required by <strong>the</strong> Manual <strong>of</strong> Uni<strong>for</strong>m Traffic Control Devices (MUTCD),<br />

and FDOT Roadway and Bridge Standard Index drawing Book. Traffic shall be<br />

maintained according to corresponding typical traffic control details as outlined in<br />

<strong>the</strong> previous noted standards. No street shall be completely blocked, nor<br />

blocked more than one-half at any time, keeping <strong>the</strong> o<strong>the</strong>r one-half open <strong>for</strong><br />

traffic, without specific approval.<br />

� If required by <strong>the</strong> Project Manager, Traffic Division or FDOT or as o<strong>the</strong>rwise<br />

authorized by <strong>the</strong> Project Manager or Consultant, <strong>the</strong> Design-Build Firm shall<br />

make arrangements <strong>for</strong> <strong>the</strong> employment <strong>of</strong> uni<strong>for</strong>med <strong>of</strong>f-duty policemen to<br />

maintain and regulate <strong>the</strong> flow <strong>of</strong> traffic through <strong>the</strong> work area. The number <strong>of</strong><br />

men required and <strong>the</strong> number <strong>of</strong> hours on duty necessary <strong>for</strong> <strong>the</strong> maintenance<br />

and regulation <strong>of</strong> traffic flow shall be provided by <strong>the</strong> <strong>City</strong> <strong>of</strong> <strong>Miami</strong> Police<br />

Department.<br />

� The Design-Build Firm shall provide all barricades with warning lights, necessary<br />

arrow boards and signs, to warn motorists <strong>of</strong> <strong>the</strong> Work throughout <strong>the</strong> Project.<br />

Adequate approved devices shall be erected and maintained by <strong>the</strong> Design-Build<br />

Firm to detour traffic.<br />

� Excavated or o<strong>the</strong>r material stored adjacent to or partially upon a roadway<br />

pavement shall be adequately marked <strong>for</strong> traffic safety at all times. The Design-<br />

Build Firm shall provide necessary access to all adjacent property during<br />

construction.<br />

� The Design-Build Firm shall be responsible <strong>for</strong> <strong>the</strong> provision, installation and<br />

maintenance <strong>of</strong> all MOT and safety devices, in accordance with <strong>the</strong> Manual <strong>of</strong><br />

Uni<strong>for</strong>m Traffic Control Devices (MUTCD) and FDOT Roadway and Bridge<br />

Standards index drawing book. In addition, <strong>the</strong> Design-Build Firm shall be<br />

responsible <strong>for</strong> providing <strong>the</strong> Project Manager with MOT plans <strong>for</strong> lane closures<br />

and/or detours <strong>for</strong> approval. These plans (sketches) shall be produced, signed<br />

and sealed by a pr<strong>of</strong>essional Engineer registered in <strong>the</strong> State <strong>of</strong> Florida,<br />

employed by <strong>the</strong> Design-Build Firm and certified under FDOT Procedure NPIL<br />

No. 625-010-010.<br />

� Where excavations are to be made in <strong>the</strong> vicinity <strong>of</strong> signalized intersections,<br />

attention is directed to <strong>the</strong> fact that vehicle loop detectors may have been<br />

embedded in <strong>the</strong> pavement. Verify <strong>the</strong>se locations by inspecting <strong>the</strong> site <strong>of</strong> <strong>the</strong><br />

Work and by contacting <strong>the</strong> Sunshine State One-Call Center (1-800-432-4770),<br />

48 hours prior to any excavation. Any loop detector which is damaged, whe<strong>the</strong>r<br />

shown on <strong>the</strong> Plans or not, shall be repaired or replaced to <strong>the</strong> satisfaction <strong>of</strong> <strong>the</strong><br />

<strong>Miami</strong> Dade County Signs and Signal Division (305-592-3470).<br />

� Where applicable, <strong>the</strong> Design-Build Firm shall notify <strong>the</strong> Traffic Division 24 hours<br />

in advance <strong>of</strong> <strong>the</strong> construction date or 48 hours in advance <strong>of</strong> construction within<br />

any signalized intersection.<br />

� Temporary pavement will be required over all cuts in pavement areas, and also<br />

where traffic is to be routed over swale or median areas. When <strong>the</strong> temporary<br />

pavement <strong>for</strong> routing traffic is no longer necessary, it shall be removed and <strong>the</strong><br />

swale or median areas restored to <strong>the</strong>ir previous condition.<br />

� Pavement markings damaged during construction shall be remarked, as required<br />

by <strong>the</strong> Traffic Division.<br />

50<br />

Design-Build Services <strong>for</strong> Seawall Stabilization and Repair Project RFP 11-12-033

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!