Manager or Consultant may make such field revisions as necessary to avoid conflict with<br />
<strong>the</strong> existing structures. Where <strong>the</strong> Design-Build Firm fails to notify <strong>the</strong> Project Manager<br />
or Consultant when an existing structure is encountered, and proceeds with <strong>the</strong> Work<br />
despite this interference, <strong>the</strong> Design-Build Firm does so at his own risk.<br />
34. Design-Build Firm’s Use <strong>of</strong> Project Site(s)<br />
Limitations may be placed on <strong>the</strong> Design-Build Firm„s use <strong>of</strong> <strong>the</strong> Project(s) site(s) and<br />
such limitations will be identified by <strong>the</strong> Project Manager. In addition to such limitations,<br />
<strong>the</strong> Project Manager may make storage available to <strong>the</strong> Design-Build Firm at his sole<br />
discretion based on availability <strong>of</strong> space. The Design-Build Firm shall also coordinate<br />
and schedule deliveries so as to minimize disruptions to <strong>City</strong> day-to-day operations.<br />
The Design-Build Firm shall limit its use <strong>of</strong> <strong>the</strong> Project site(s), so as to allow <strong>for</strong> <strong>the</strong> <strong>City</strong>‟s<br />
continuous operation. This is necessary, as <strong>the</strong> Project Site(s) may remain in operation<br />
during <strong>the</strong> Work.<br />
� The Design-Build Firm shall:<br />
o Confine operations at <strong>the</strong> Project(s) site(s) to <strong>the</strong> areas permitted by <strong>the</strong><br />
Project Manager; not disturb portions <strong>of</strong> <strong>the</strong> Project(s) site(s) beyond <strong>the</strong><br />
specified areas; con<strong>for</strong>m to Project(s) site(s) rules and regulations affecting<br />
<strong>the</strong> Work.<br />
o Keep existing driveways and entrances serving surrounding facilities clear<br />
and available to <strong>the</strong> <strong>City</strong>, its employees and <strong>the</strong> public at all times; not use<br />
areas <strong>for</strong> parking and/or storage <strong>of</strong> materials except as authorized by <strong>the</strong><br />
Project Manager.<br />
o Assume all responsibility <strong>for</strong> its tools, equipment and materials, including any<br />
materials purchased <strong>for</strong> <strong>the</strong> Work and not accepted by <strong>the</strong> <strong>City</strong>, and its<br />
vehicles while per<strong>for</strong>ming Work <strong>for</strong> <strong>the</strong> <strong>City</strong> and/or while parked or stored at a<br />
<strong>City</strong> facility. The <strong>City</strong> assumes no liability <strong>for</strong> damage or loss to <strong>the</strong> items<br />
specified in this paragraph.<br />
Access to parking and egress from <strong>the</strong> Project(s) site(s) shall be subject to <strong>the</strong> approval<br />
<strong>of</strong> <strong>the</strong> Project Manager.<br />
35 Materials and Equipment<br />
Design-Build Firm warrants to <strong>City</strong> that all materials and equipment furnished under <strong>the</strong><br />
Contract will be new unless o<strong>the</strong>rwise specified and that all <strong>of</strong> <strong>the</strong> Work will be <strong>of</strong> <strong>the</strong><br />
highest quality, free from faults and defects and in con<strong>for</strong>mance with <strong>the</strong> Contract. All<br />
Work not con<strong>for</strong>ming to <strong>the</strong>se requirements, including substitutions not properly<br />
approved and authorized, may be considered defective. If required by <strong>the</strong> Project<br />
Manager or Consultant, Design-Build Firm shall furnish satisfactory evidence as to <strong>the</strong><br />
kind and quality <strong>of</strong> materials and equipment. This warranty is not limited by any o<strong>the</strong>r<br />
provisions within <strong>the</strong> Contract Documents.<br />
36. Material and Equipment Shipment, Handling, Storage and Protection<br />
Preparation <strong>for</strong> Shipment<br />
When practical, equipment shall be factory assembled. The equipment parts and<br />
assemblies that are shipped unassembled shall be furnished with assembly plan and<br />
instructions. The separate parts and assemblies shall be factory match-marked or<br />
tagged in a manner to facilitate assembly. All assemblies are to be made by <strong>the</strong> Design-<br />
Build Firm at no additional cost to <strong>the</strong> <strong>City</strong>.<br />