The Project Manager and Consultant shall have access to <strong>the</strong> Project(s) Site(s) at all<br />

times. The Design-Build Firm shall provide safe facilities <strong>for</strong> such access so <strong>the</strong> Project<br />

Manager and Consultant may per<strong>for</strong>m <strong>the</strong>ir functions under <strong>the</strong> Contract. The Project<br />

Manager and Consultant will make periodic visits to <strong>the</strong> Work Site to become generally<br />

familiar with <strong>the</strong> progress and quality <strong>of</strong> <strong>the</strong> Work, and to determine if <strong>the</strong> Work is<br />

proceeding in accordance with <strong>the</strong> Contract Documents.<br />

The Project Manager will not be responsible <strong>for</strong> construction means, methods,<br />

techniques, sequences or procedures, or <strong>for</strong> safety precautions and programs in<br />

connection with <strong>the</strong> Work, and will not be responsible <strong>for</strong> <strong>the</strong> Design-Build Firm‟s failure<br />

to carry out <strong>the</strong> Work in accordance with <strong>the</strong> Contract Documents.<br />

The Project Manager and Consultant will have authority to reject Work that does not<br />

con<strong>for</strong>m to <strong>the</strong> Contract Documents. Whenever, in his or her opinion, it is considered<br />

necessary or advisable to ensure <strong>the</strong> proper completion <strong>of</strong> <strong>the</strong> Contract Documents <strong>the</strong><br />

Project Manager and Consultant will have authority to require special inspections or<br />

testing <strong>of</strong> <strong>the</strong> Work, whe<strong>the</strong>r or not such Work is fabricated, installed or completed.<br />

Nei<strong>the</strong>r <strong>the</strong> Project Manager‟s nor Consultant‟s authority to act under this paragraph, nor<br />

any decision made by him in good faith ei<strong>the</strong>r to exercise or not to exercise such<br />

authority, shall give rise to any duty or responsibility <strong>of</strong> <strong>the</strong> Project Manager or<br />

Consultant to <strong>the</strong> Design-Build Firm, any Sub Design-Build Firm, Subconsultant, supplier<br />

or any <strong>of</strong> <strong>the</strong>ir agents, employees, or any o<strong>the</strong>r person per<strong>for</strong>ming any <strong>of</strong> <strong>the</strong> Work.<br />

All interpretations and recommendations <strong>of</strong> <strong>the</strong> Project Manager and Consultant shall be<br />

consistent with <strong>the</strong> intent <strong>of</strong> <strong>the</strong> Contract Documents.<br />

The Project Manager shall notify <strong>the</strong> Design-Build Firm in writing where <strong>the</strong> Work does<br />

not comply with <strong>the</strong> scope <strong>of</strong> <strong>services</strong>.<br />

The Project Manager will not be responsible <strong>for</strong> <strong>the</strong> acts or omissions <strong>of</strong> <strong>the</strong> Design-<br />

Build Firm, any Sub Design-Build Firm, Subconsultant, or any <strong>of</strong> <strong>the</strong>ir agents or<br />

employees, or any o<strong>the</strong>r persons per<strong>for</strong>ming any <strong>of</strong> <strong>the</strong> Work.<br />

24. Inspection <strong>of</strong> Work<br />

Inspectors and <strong>the</strong> <strong>City</strong> shall at all times have access to <strong>the</strong> Work during normal work<br />

hours, and Design-Build Firm shall provide proper facilities <strong>for</strong> such access and <strong>for</strong><br />

inspecting, measuring and testing.<br />

Should <strong>the</strong> Contract Documents, Consultant/Inspector Project Manager‟s instructions,<br />

any laws, ordinances, or any public authority require any <strong>of</strong> <strong>the</strong> Work to be specially<br />

tested or approved, Design-Build Firm shall give Project Manager and Consultant timely<br />

notice <strong>of</strong> readiness <strong>of</strong> <strong>the</strong> Work <strong>for</strong> testing. If <strong>the</strong> testing or approval is to be made by an<br />

authority o<strong>the</strong>r than <strong>City</strong>, timely notice shall be given <strong>of</strong> <strong>the</strong> date fixed <strong>for</strong> such testing.<br />

Testing shall be made promptly, and, where practicable, at <strong>the</strong> source <strong>of</strong> supply. If any<br />

<strong>of</strong> <strong>the</strong> Work should be covered up without approval or consent <strong>of</strong> Project Manager or<br />

Consultant, it must, if required by <strong>the</strong> Project Manager or Consultant, be uncovered <strong>for</strong><br />

examination and properly restored at Design-Build Firm‟s expense.<br />

Unless o<strong>the</strong>rwise provided, <strong>the</strong> Design-Build Firm shall make arrangements <strong>for</strong> such<br />

tests, inspections and approvals with <strong>the</strong> <strong>City</strong>‟s testing laboratory or entity. The Design-<br />

Build Firm shall give <strong>the</strong> <strong>City</strong> and <strong>the</strong> Consultant timely notice <strong>of</strong> when and where tests<br />

and inspections are to be made so that <strong>the</strong> <strong>City</strong> or Consultant may be present <strong>for</strong> such<br />

procedures.<br />

Re-examination <strong>of</strong> any <strong>of</strong> <strong>the</strong> Work may be ordered by <strong>the</strong> Project Manager or<br />

Consultant, and if so ordered, <strong>the</strong> Work must be uncovered by Design-Build Firm. If such<br />

22<br />

Design-Build Services <strong>for</strong> Seawall Stabilization and Repair Project RFP 11-12-033