In case any Work or materials shall be required to be done or furnished under <strong>the</strong><br />

provisions <strong>of</strong> this Article, <strong>the</strong> Design-Build Firm shall at <strong>the</strong> end <strong>of</strong> each day furnish to <strong>the</strong><br />

<strong>City</strong> such documentation as <strong>the</strong> <strong>City</strong> may require supporting all <strong>the</strong> costs <strong>of</strong> <strong>the</strong> Extra<br />

Work. If payments on account are desired as <strong>the</strong> Extra Work progresses, <strong>the</strong> Design-<br />

Build Firm shall render an itemized statement showing <strong>the</strong> total amount expended <strong>for</strong><br />

each class <strong>of</strong> labor and <strong>for</strong> each kind <strong>of</strong> material on account <strong>of</strong> each item <strong>of</strong> Work as a<br />

condition precedent to <strong>the</strong> inclusion <strong>of</strong> such payment in a partial estimate. Upon <strong>the</strong><br />

request <strong>of</strong> <strong>the</strong> <strong>City</strong>, <strong>the</strong> Design-Build Firm shall produce <strong>for</strong> audit by <strong>the</strong> <strong>City</strong>, books,<br />

vouchers, collective bargaining labor agreements, records or o<strong>the</strong>r documents showing<br />

<strong>the</strong> actual cost <strong>for</strong> labor and materials. Such documents shall not be binding on <strong>the</strong> <strong>City</strong>.<br />

The Project Manager shall determine any questions or dispute as to <strong>the</strong> correct cost <strong>of</strong><br />

such labor or materials or plant.<br />

In case <strong>the</strong> Design-Build Firm is ordered to per<strong>for</strong>m Work under this Article, which in <strong>the</strong><br />

opinion <strong>of</strong> <strong>the</strong> Project Manager, it is impracticable to have per<strong>for</strong>med by <strong>the</strong> Design-Build<br />

Firm‟s own employees, <strong>the</strong> Design-Build Firm will, subject to <strong>the</strong> approval <strong>of</strong> <strong>the</strong> Project<br />

Manager, be paid <strong>the</strong> actual cost to Design-Build Firm <strong>of</strong> such Work, and in addition<br />

<strong>the</strong>reto five (5%) percent to cover <strong>the</strong> Design-Build Firm‟s superintendence,<br />

administration and o<strong>the</strong>r overhead expenses.<br />

Payment <strong>of</strong> any amount under this Article shall be subject to subsequent audit and<br />

approval, disapproval, modification or revision by representatives <strong>of</strong> <strong>the</strong> <strong>City</strong>.<br />

57. As-Built Drawings<br />

During <strong>the</strong> Work, Design-Build Firm shall maintain records <strong>of</strong> all deviations from <strong>the</strong><br />

Drawings and Specifications as approved by <strong>the</strong> Project Manager and prepare As-Built<br />

Record Drawings showing correctly and accurately all changes and deviations made<br />

during construction to reflect <strong>the</strong> Work as it was actually constructed. It is <strong>the</strong><br />

responsibility <strong>of</strong> <strong>the</strong> Design-Build Firm to check <strong>the</strong> As-Built Drawings <strong>for</strong> errors and<br />

omissions prior to submittal to <strong>the</strong> <strong>City</strong> and certify in writing that <strong>the</strong> As-Built Drawings<br />

are correct and accurate, including <strong>the</strong> actual location <strong>of</strong> all internal piping,<br />

electrical/signal conduits in or below <strong>the</strong> concrete floor. Indicate <strong>the</strong> size, depth and<br />

voltage in each conduit.<br />

Legibly mark to record actual construction: On-site structures and site Work as follows:<br />

� Depths <strong>of</strong> various elements <strong>of</strong> foundation in relation to finish first floor datum.<br />

� All underground piping and ductwork with elevations and dimensions and<br />

locations <strong>of</strong> valves, pull boxes, etc. Changes in location. Horizontal and<br />

vertical locations <strong>of</strong> underground utilities and appurtenances, referenced to<br />

permanent surface improvements. Actual installed pipe material, class, etc.<br />

� Location <strong>of</strong> internal utilities and appurtenances concealed in <strong>the</strong> construction,<br />

referenced to visible and accessible features <strong>of</strong> <strong>the</strong> structure. Air conditioning<br />

ducts with locations <strong>of</strong> dampers, access doors, fans and o<strong>the</strong>r items needing<br />

periodic maintenance.<br />

� Field changes in dimensions and details.<br />

� Changes made by Project Manager‟s or Consultant‟s written instructions or<br />

by Change Order.<br />

� Details not on original Contract Drawings.<br />

� Equipment, conduit, electrical panel locations.<br />

� Project Manager‟s or Consultant‟s schedule changes according to Design-<br />

Build Firm‟s records and shop drawings.<br />

Specifications and Addenda: Legibly mark each section to record:<br />

42<br />

Design-Build Services <strong>for</strong> Seawall Stabilization and Repair Project RFP 11-12-033