Equipment and materials shall be stored prior to installation as recommended by <strong>the</strong><br />

manufacturer. Generally, materials such as pipe shall be stored <strong>of</strong>f <strong>the</strong> ground in<br />

approved storage yards. Items subject to damage by <strong>the</strong> elements, vandalism, or <strong>the</strong>ft<br />

shall be stored in secure <strong>build</strong>ings. Items requiring environmental control <strong>for</strong> protection<br />

shall be provided with <strong>the</strong> necessary environmentally controlled storage facilities at no<br />

cost to <strong>the</strong> <strong>City</strong>.<br />

Insurance<br />

The Design-Build Firm‟s insurance shall adequately cover <strong>the</strong> value <strong>of</strong> materials<br />

delivered but not yet incorporated into <strong>the</strong> Work.<br />

Inventory Control<br />

Equipment and materials shall be stored in a manner to provide easy access <strong>for</strong><br />

inspection and inventory control. The Design-Build Firm shall keep a running account <strong>of</strong><br />

all materials in storage to facilitate inspection and to estimate progress payments <strong>for</strong><br />

materials delivered but not installed in <strong>the</strong> Work.<br />

Equipment‟s Maintenance Prior to Acceptance by <strong>the</strong> <strong>City</strong><br />

Provide <strong>the</strong> required or manufacturer‟s recommended maintenance during storage,<br />

during <strong>the</strong> installation, and until such time as <strong>the</strong> <strong>City</strong> accepts <strong>the</strong> equipment <strong>for</strong> full-time<br />

operation.<br />

Salvage Equipment<br />

Any salvageable pipe, fittings, or o<strong>the</strong>r miscellaneous material or equipment removed<br />

during construction and not reused in <strong>the</strong> Work shall be cleaned, hauled, and stored by<br />

<strong>the</strong> Design-Build Firm at his own expense, where directed by <strong>the</strong> Project Manager, and<br />

shall remain <strong>the</strong> property <strong>of</strong> <strong>the</strong> <strong>City</strong>. All o<strong>the</strong>r material shall be disposed <strong>of</strong> by <strong>the</strong><br />

Design-Build Firm at his own expense.<br />

37. Manufacturer’s Instructions<br />

The Design-Build Firm shall:<br />

Comply with manufacturer‟s requirements <strong>for</strong> <strong>the</strong> handling, delivery, storage, and<br />

installation <strong>of</strong> all materials, and equipment. Where required by <strong>the</strong> Contract Documents,<br />

Design-Build Firm shall submit manufacturer‟s printed instructions <strong>for</strong> delivery, storage,<br />

assembly, and installation.<br />

Comply with <strong>the</strong> manufacturer‟s applicable instructions and recommendations <strong>for</strong> <strong>the</strong><br />

per<strong>for</strong>mance <strong>of</strong> <strong>the</strong> Work, to <strong>the</strong> extent that <strong>the</strong>se instructions and recommendations are<br />

more explicit or more stringent than requirements indicated in <strong>the</strong> Contract Documents<br />

including <strong>the</strong> Contract Documents.<br />

Inspect each item <strong>of</strong> material or equipment immediately prior to installation and reject<br />

damaged and defective items.<br />

Provide attachment and connection devices and methods <strong>for</strong> securing <strong>the</strong> Work; secure<br />

Work true to line plumb and level, and within recognized industry standards; allow <strong>for</strong><br />

expansion and <strong>build</strong>ing movement; provide uni<strong>for</strong>m joint width in exposed Work; arrange<br />

joints in exposed Work to obtain <strong>the</strong> best visual effect and refer questionable visual<br />

effect choices to <strong>the</strong> Consultant <strong>for</strong> final decision when applicable to <strong>the</strong> Work.<br />

Recheck measurements and dimensions <strong>of</strong> <strong>the</strong> Work, as an integral step in starting each<br />

portion <strong>of</strong> <strong>the</strong> Work.<br />

28<br />

Design-Build Services <strong>for</strong> Seawall Stabilization and Repair Project RFP 11-12-033