Design-Build Firm shall sign, in <strong>the</strong> proper block, each sheet <strong>of</strong> shop drawing and data<br />
and each sample label to certify compliance with <strong>the</strong> requirements <strong>of</strong> <strong>the</strong> Contract<br />
Documents. Shop drawing submitted without <strong>the</strong> stamp and signature shall be rejected<br />
and it will be considered that <strong>the</strong> Design-Build Firm has not complied with <strong>the</strong><br />
requirements <strong>of</strong> <strong>the</strong> Contract Documents. Design-Build Firm shall bear <strong>the</strong> risk <strong>of</strong> any<br />
delays that may occur as a result <strong>of</strong> such rejection.<br />
<strong>City</strong> shall not be liable <strong>for</strong> any materials, fabrication <strong>of</strong> products or Work commenced that<br />
requires submittals until <strong>the</strong> Project Manager or Consultant has returned approved<br />
submittals to <strong>the</strong> Design-Build Firm.<br />
Project Manager shall make every ef<strong>for</strong>t to review submittals within fourteen (14)<br />
calendar days from <strong>the</strong> date <strong>of</strong> receipt by <strong>the</strong> Project Manager. Project Manager‟s review<br />
shall only be <strong>for</strong> con<strong>for</strong>mance with <strong>design</strong> concepts and <strong>the</strong> in<strong>for</strong>mation provided in <strong>the</strong><br />
Contract Documents. The approval <strong>of</strong> a separate item shall not constitute approval <strong>of</strong> an<br />
assembly in which <strong>the</strong> item functions. The Project Manager or Consultant shall return<br />
<strong>the</strong> shop drawings to <strong>the</strong> Design-Build Firm <strong>for</strong> <strong>the</strong>ir use and distribution.<br />
Acceptance <strong>of</strong> any submittal shall not relieve <strong>the</strong> Design-Build Firm <strong>of</strong> any responsibility<br />
<strong>for</strong> any deviations from <strong>the</strong> requirements <strong>of</strong> <strong>the</strong> Contract Documents unless <strong>the</strong> Design-<br />
Build Firm has given written notice to <strong>the</strong> Project Manager <strong>of</strong> <strong>the</strong> specific deviations and<br />
<strong>the</strong> Project Manager has issued written approval <strong>of</strong> such deviations.<br />
By approving and submitting Shop Drawings, Product Data and Samples, <strong>the</strong> Design-<br />
Build Firm represents that all materials, field measurements and field construction<br />
criteria related <strong>the</strong>reto have been verified, checked and coordinated with <strong>the</strong><br />
requirements <strong>of</strong> <strong>the</strong> Work and have been verified, checked and coordinated with this<br />
Contract Documents.<br />
Design-Build Firm shall be responsible <strong>for</strong> <strong>the</strong> distribution <strong>of</strong> all shop drawings, copies <strong>of</strong><br />
product data and samples, which bear <strong>the</strong> Project Manager‟s or Consultant‟s stamp <strong>of</strong><br />
approval. Distribution shall include, but not be limited to; job site file, record documents<br />
file, Sub-Design-Build Firm, suppliers, and o<strong>the</strong>r affected parties or entities that require<br />
<strong>the</strong> in<strong>for</strong>mation.<br />
The Design-Build Firm shall also provide copies <strong>of</strong> all plans approved and permitted by<br />
<strong>the</strong> required governing authorities.<br />
The Design-Build Firm shall not be relieved <strong>of</strong> responsibility <strong>for</strong> errors or omissions in<br />
any and all submittals by <strong>the</strong> Project Manager‟s or Consultant‟s acceptance <strong>the</strong>re<strong>of</strong>. The<br />
Design-Build Firm warrants <strong>the</strong> adequacy <strong>for</strong> <strong>the</strong> purpose intended <strong>of</strong> any shop drawings<br />
or portion <strong>of</strong> a shop drawing that alters, modifies or adds to <strong>the</strong> requirements <strong>of</strong> <strong>the</strong><br />
Contract Documents.<br />
Nothing in <strong>the</strong> Project Manager‟s or Consultant‟s review <strong>of</strong> Shop Drawings, Submittals<br />
and Samples shall be construed as authorizing additional work or increased cost to <strong>the</strong><br />
<strong>City</strong>.<br />
40. Shop Drawings, Working Drawings and Samples<br />
The Design-Build Firm shall submit to <strong>the</strong> Design Criteria Pr<strong>of</strong>essional <strong>for</strong> acceptance, if<br />
any, such working drawings, shop drawings, test reports and data on materials and<br />
equipment, and material samples as are included in <strong>the</strong> Design Documents prepared by<br />
<strong>the</strong> Design-Build Firm, or in <strong>the</strong> DCP.<br />
SHOP DRAWINGS: The term "Shop Drawings" shall be construed to mean Design-Build<br />
Firm's plans <strong>for</strong> material and equipment, which becomes an integral part <strong>of</strong> <strong>the</strong> Project.<br />
Shop drawings shall consist <strong>of</strong> fabrication, erection and setting drawings and schedule<br />
30<br />
Design-Build Services <strong>for</strong> Seawall Stabilization and Repair Project RFP 11-12-033