12.07.2015 Views

Assurance de qualité pour le cancer rectal – phase 2 ...

Assurance de qualité pour le cancer rectal – phase 2 ...

Assurance de qualité pour le cancer rectal – phase 2 ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

124 PROCARE <strong>–</strong> <strong>phase</strong> 2 KCE reports 81PROPORTION OF CSTAGE II-III PATIENTS TREATED WITHNEOADJUVANT 5-FU BASED CHEMORADIATION, THAT RECEIVEDA CONTINUOUS INFUSION OF 5-FUMeasurement in prospective PROCARE databaseThe calculation of the <strong>de</strong>nominator of this QI is i<strong>de</strong>ntical to that of the numerator ofthe previous QI. In the data entry form, no specific variab<strong>le</strong> is availab<strong>le</strong> for theregistration of continuous infusion. This information can be extracted from the variab<strong>le</strong>s‘CH_V112’ and ‘CH_V122’, where the chemotherapy regimen is registered. However,this needs too much interpretation to allow a calculation in SAS, ren<strong>de</strong>ring the QI notmeasurab<strong>le</strong> at this moment.Measurement in coup<strong>le</strong>d administrative databaseAlthough it is possib<strong>le</strong> to i<strong>de</strong>ntify patients receiving 5-FU through a specific CNK-co<strong>de</strong>in the IMA database (cfr. supra), it is impossib<strong>le</strong> to know if this 5-FU is given viacontinuous infusion. Therefore, this QI is not measurab<strong>le</strong> with the administrativedatabases.PROPORTION OF CSTAGE II-III PATIENTS TREATED WITH ALONG COURSE OF PREOPERATIVE PELVIC RT ORCHEMORADIATION, THAT COMPLETED THIS NEOADJUVANTTREATMENT WITHIN THE PLANNED TIMINGMeasurement in prospective PROCARE database (Figure 36)The calculation of the <strong>de</strong>nominator of this QI is i<strong>de</strong>ntical to that of the numerator of QI1222. Within this group of patients, those without a treatment interruption of morethan 5 working days are se<strong>le</strong>cted using variab<strong>le</strong> ‘RD_V107’. As for variab<strong>le</strong> ‘FU_V139’(see above), the <strong>de</strong>fault value of variab<strong>le</strong> ‘RD_V107’ was ‘0’ (i.e. missing values alsoreceived a value ‘0’), making it impossib<strong>le</strong> to distinguish absence of treatmentinterruption from missing values. However, in a random samp<strong>le</strong> of 20 forms with a value‘0’ for variab<strong>le</strong> ‘RD_V107’ only 1 missing value (5%) was found.Measurement in coup<strong>le</strong>d administrative databaseAs mentioned before, the i<strong>de</strong>ntification of a long course of RT, i.e. at <strong>le</strong>ast 25 fractionsof 1.8 Gy, is impossib<strong>le</strong> in the administrative databases.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!