12.07.2015 Views

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning <strong>Study</strong> ReportPart B: Interstate 71 Access Improvement <strong>Study</strong>, PID 77628• Presence of sensitive noise receptors within the study area that may be affectedby the conceptual alternatives.Please see the Red Flag Summary Report for additional information concerningenvironmental resources within the study area that may be potential affected by theconceptual alternatives recommended for further study.7.5.1. ScheduleThe time needed to complete all recommended access improvement is largely dependenton the availability of sufficient funding to complete the project development process withoutdelay. Using conventional sources of funding, construction on mainline capacity additionsand/or interchange modifications is not likely to begin prior to 2016. Please refer toFigure 5 for a conceptual time line. This figure assumes continued implementation of therecommendations following completion of the <strong>Uptown</strong> <strong>Transportation</strong> <strong>Study</strong> in 2006.I-71 INTERSTATE ACCESS IMPROVEMENT STUDYRemaining Steps in ODOT's Major Project Development Process4Planning <strong>Study</strong>Report5 and 6Conceptual andFeasible Alternatives7Preferred Alternativeand DEISPart A Recommendations8Environmental Clearance(FEIS and ROD)9Stage 2 DetailedDesign10ROW Plan andAcquisition11Stage 3 DetailedDesignPID 7762812Final Plan PackageThe colored boxes represent the estimated duration of each step in the ODOTProject Development Process (PDP)13 Contract Award14Construction2006 2007 2008 20092010 2011 20122013 2014 2015 20162017 2018Notes: 1. Applications for TRAC funding submitted in 2007 will provide funding for 2014 Major New Construction Program2. I-71 construction activities will need to be coordinated with I-75 construction activitiesFigure 5: Remaining Steps in the ODOT Project Development ProcessImplementation of the <strong>Uptown</strong> <strong>Transportation</strong> <strong>Study</strong> Part A recommendations will generallyprecede modifications to I-71 access. It is imperative that the connecting arterial networkhave sufficient capacity to accommodate future improvements to interstate access atTaft/McMillan and/or ML King Drive. Detailed study of the ML King Drive corridor along withselected capacity improvements on Taft/McMillan, Reading Road, Burnet Avenue and MLKing Drive must be an initial priority.The policy recommendations concerning zoning, utility coordination and right-of-waypreservation should be implemented immediately<strong>Uptown</strong> <strong>Transportation</strong> <strong>Study</strong> 82URS CorporationNovember 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!