12.07.2015 Views

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning <strong>Study</strong> ReportPart B: Interstate 71 Access Improvement <strong>Study</strong>, PID 77628The following projects have been identified as long range needs within the study area butare not incorporated into the fiscally constrained long range plan. In addition to the projectsin Table 4, implementation of light rail transit service is recommended in corridors within thestudy area.Table 4: <strong>OKI</strong> 2030 <strong>Transportation</strong> Plan Additional ProjectsFacility Location DescriptionCostMillions $Cincinnati Zoo Vine Street Parking & Transit 2.0Dana Avenue Victory Parkway to IR-71 Add 2 lanes 19.0<strong>Uptown</strong>/DowntownConnectorVine StreetTBDNixon Street toErkenbrecher Avenue4.6.1.2. <strong>OKI</strong> <strong>Transportation</strong> Improvement PlanStreet Car asdefined in RegionalRail Plan61.0Add 1 lane 4.0The <strong>OKI</strong> <strong>Transportation</strong> Improvement Plan (TIP) is a short range (4 years) plan updated ona 2-year cycle with ongoing amendments as needed. It provides a listing, by county, of allfederally assisted highway and transit improvements that are contemplated by municipal,county, or state governments or transit authorities and is fiscally constrained to meetexpected sources of transportation funding.The <strong>OKI</strong> FY 2006-2009 TIP is a compilation of highway and transit projects in the Ohio,Kentucky, and Indiana portions of the <strong>OKI</strong> region that are scheduled to receive state and/orfederal funding. The document was adopted by the <strong>OKI</strong> Executive Committee on April 14,2005. There are five roadway projects included in the <strong>OKI</strong> FY 2006-2009 TIP.Table 5: <strong>OKI</strong> FY 2006 - 2009 TIPNo. Facility Location Description780102448577706GilbertAve.M.L.KingVineStreet76257 IR-7524954 IR-71Between Eden ParkDrive and E. McMillanStreetWoodside Place to VineStreetBridge over Vine Streetfrom Erkenbrecher tothe Zoo's parking lot.From 0.1 mile N ofHarrison Ave. to 0.1miles S of PaddockRoadI-71 over Eden ParkDriveEstimatedCost ($)Streetscape $844,000Reconstruction/Rehabilitationand Intersection Improvement$6,240,000Pedestrian Bridge $1,100,000<strong>Study</strong> the corridor for accessimprovements. Work includesmajor rehabilitation ofpavement.Paint Structural SteelBridge No. HAM 71-0243$159,460,000$1,428,000<strong>Uptown</strong> <strong>Transportation</strong> <strong>Study</strong> 23URS CorporationNovember 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!