12.07.2015 Views

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning <strong>Study</strong> ReportPart B: Interstate 71 Access Improvement <strong>Study</strong>, PID 776284.6.2. ODOT Plans and Projects4.6.2.1. HAM 75 2.30 Mill Creek ExpresswayThis preliminary engineering project is evaluating capacity enhancements to the I-75mainline from the Western Hills Viaduct to Paddock Road at the western border of the<strong>Uptown</strong> area. The project also includes the development of recommended alternatives forthe reconstruction of the I-75 Interchanges serving <strong>Uptown</strong> located at Hopple Street,I-74/Central Parkway, and Mitchell Avenue.Two significant issues regarding I-75 access remain to be resolved as of June 2006.The intersection of Hopple/ML King Drive/Central Parkway is planned to be grade separatedas part of this project.Local access to Central Parkway (US-27/127) from I-74 may not be maintained in the future,thus redirecting this traffic flow north to Mitchell Avenue or south to Hopple Street.The project is currently in Step 6 of the ODOT Major Project Development Process. Thecurrent phase of the project is scheduled for completion in late 2006 when preferredalternatives are advanced for the mainline and interchanges.4.6.2.2. HAM 71/75 0.000.22 Brent Spence BridgeThis project is evaluating capacity and safety enhancements to I-71/75 from the WesternHills Viaduct (Harrison Avenue) south to Kyles Lane in Kenton County, Kentucky. Thisincludes the potential replacement or rehabilitation of the Brent Spence Bridge carryingI-71/75 over the Ohio River.Alternatives for modification of the I-75 interchange serving Harrison Avenue would providenew direct access from I-75 to Central Parkway and McMillan Street. If such access isprovided in the future, it may alter the current distribution of traffic flow in the <strong>Uptown</strong> <strong>Study</strong>area south of ML King Drive. The project is currently in Step 4 of the ODOT Major ProjectDevelopment Process; it is anticipated that a preferred alternative for the interchange will bedetermined in late 2007.4.6.2.3. Miscellaneous Maintenance ProjectsBesides the two major preliminary engineering studies for I-75 in the <strong>Uptown</strong> area, there area number of smaller maintenance projects included in the ODOT District 8 work planincluding the re-paving of US 42 (Reading Road) and US-22 (Gilbert Avenue) within the Cityof Cincinnati.Additionally the superstructure of Bridge HAM 71-0243 which carries I-71 over Eden ParkDrive and Florence Avenue will be painted at an estimated cost of $1.5 Million.<strong>Uptown</strong> <strong>Transportation</strong> <strong>Study</strong> 24URS CorporationNovember 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!