12.07.2015 Views

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

Uptown Transportation Study - OKI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning <strong>Study</strong> ReportPart B: Interstate 71 Access Improvement <strong>Study</strong>, PID 776284.6.3. Community Plans and Projects• Community Tax Increment Financing Districts• The Clifton Heights Urban Renewal Plan• Evanston 5-Points Urban Renewal Plan• Corryville/University Village Urban Renewal Plan• Avondale Vision Plan 2005• Burnet Avenue Urban Renewal Plan• Keystone Parke4.6.4. Institutional Plans• <strong>Uptown</strong> Crossings• <strong>Uptown</strong> Consortium Strategic Opportunity Plan• <strong>Uptown</strong> Consortium Research Park• University of Cincinnati Campus Masterplan• SORTA MetroMoves Plan4.7. Roadway NetworkInterstate-71:I-71 within the study area extends from SLM 2.0 (Liberty Street) to 6.0 (Dana Avenue).The number of travel lanes on I-71 varies from three to five with numerous entrance and exitramps. There is a center median barrier wall throughout the entire study area. Roadwaylighting is provided throughout the study area.The typical cross sections for the northbound and southbound directions are more fullydescribed below:Northbound:At the southern end of the study area, I-71 is three lanes in both directions. There are threesuccessive entrance ramps on the right: I-471, Gilbert Avenue, and Reading Road.Between the I-471 entrance and the Gilbert Avenue entrance, a left hand exit provided forI-71 northbound access to Reading Road northbound, or Dorchester Avenue. At the GilbertAvenue entrance ramp, a fourth lane is added and at the Reading Road entrance ramp, afifth lane is added and continues up hill to a location north of WH Taft Road where thesection begins to taper back to a four lane section. A single lane entrance ramp from apartial interchange at McMillan Street enters on the right between WH Taft Road and OakStreet, which continues the fifth lane as an acceleration lane to a point south of ML KingDrive. A single lane exit is located at Duck Creek Road with the fifth lane added again as adeceleration lane at a point north of Victory Parkway. North of this exit, the section remains4 lanes to the north end of the study area.<strong>Uptown</strong> <strong>Transportation</strong> <strong>Study</strong> 25URS CorporationNovember 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!