12.07.2015 Views

1535 Relative Humidity Transmitter - Novatech Controls

1535 Relative Humidity Transmitter - Novatech Controls

1535 Relative Humidity Transmitter - Novatech Controls

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

!FLOWSWITCHSOLENOIDVALVE(NOTE 4)PUMPOUTLETRGC 01THE LID MUST BE ONTHIS BOX AT ALL TIMESTO RETAIN HEAT WITHINTHE BOX.COOLING COIL240VMAINSJUNCTION BOXINLETGAS FLOW1/4" O.D. TUBING WITHRAUTOTRACE HEATERAND CLADDING.S.S. TUBING PREFERRED.3/8" TUBINGS.S. PREFERREDREF PORTSAMPLE PROBECAL PORTNOTES:1. SLOPE PROBES & LINES DOWNWARDS ATAN ANGLE OF 10ø MINIMUM.1231 PROBE2. COOLING COIL REQUIRES FREE AIR CIRCULATION.3.AUTOTRACE HEATER NOT REQUIRED IF RGC OUTLETLINE DOES NOT COOL BELOW THE TEMPERATURE OFTHE RGC COIL OUTLET. IF IN DOUBT INSTALL THE HEATER.4. THE SOLENOID VALVE IS (OPTIONAL) IS REQUIRED FOR ANALYSERSWHICH DISPLAY BOTH % WATER VAPOUR & % OXYGEN.5. DISTANCE BETWEEN RGC 01 & PROBE SHOULD BEMINIMISED. TYPICALLY 1.5M.6.THE RGC 01 SHOULD BE INSTALLED IN AN AMBIENTTEMPERATURE OF LESS THAN 50øC.The ideas & design in this drawing remain theproperty of <strong>Novatech</strong> <strong>Controls</strong> (Aust) Pty Ltd.Use without their express permission isprohibited.FIGURE 1.6NOVATECH CONTROLS (AUST) PTY LTD.Description:INSTALLATION OF RGC 01 REFERENCEGAS CONDITIONERDrawing Name: M:ATEAM\DRAWINGS\RGC\INSTALLScale: NTSDate:8/8/94General Revision Rev.109/01/95!Figure 1.6 How to Install the reference gas coolerNOVATECH HUMIDITY TRANSMITTER Page 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!