13.07.2015 Views

11-10-03 Agenda - Santa Rosa Junior College

11-10-03 Agenda - Santa Rosa Junior College

11-10-03 Agenda - Santa Rosa Junior College

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

n) Future parking structures/areas will be sufficient and convenient forstudent access as well as attentive to community concerns and trafficcirculation.o) Technology infrastructures will be continuously upgraded to reflectadvances supportive to the educational mission.2. Major Projects Planning:a). <strong>Santa</strong> <strong>Rosa</strong> Library construction will start late Fall, 20<strong>03</strong> or early Spring,2004 with occupancy during Summer/Fall 2006.b). Petaluma Modulars will be developed and occupied by August, 2004.c). <strong>Santa</strong> <strong>Rosa</strong> Multi-Level Parking Improvements will commence design in20<strong>03</strong>, construction start in 2004 with occupancy anticipated by lateSpring, 2005.d). Shone Farm Ag Pavilion occupancy by Fall, 2004e). Doyle Center Multi-Level Design to commence during 2004 withoccupancy in 2007.f). Bookstore may expand into vacated portions of Pioneer Hall upon newstudent center occupancy in 2007 or expand into the new studentcenter.g). Multi-level Barnett Hall Replacement design to commence within nexttwo years. Current planning assumes it will be located on existing BarnettHall footprint. Anticipated occupancy would be 2007/2008.h). Public Safety Training Center Fire Tower construction completed in Spring,2005.i). Elliott Avenue Development to provide support, office and meeting spaceas part of replacement of existing campus temporary facilities anddesigned with SRJC heritage facilities architectural theme (collegiategothic). Phased development related to replacement of existing housesand future acquisitions.j). Graphics to be removed from current Elliott Avenue location andconsideration be given for relocation.k). Major infrastructure improvements (utilities, circulation and schedulemaintenance) to continue throughout. Continue to leverage possiblestate funding match.l). Culinary Arts @ Railroad Square planning to continue with City andFood/Wine Center planning activities. Earliest anticipated occupancydate, at completion of existing Brickyard lease, would be 2008.m). Technology and Equipment Acquisition to continue on Measure Aeighteen year plan implementation. Technology Plan acquisitions will bereviewed on an annual basis.Facilities Master Plan DiscussionOctober 24, 20<strong>03</strong> RevisionPage Four26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!