13.07.2015 Views

Amendment to the Union Section Joint Venture's ... - SRK Consulting

Amendment to the Union Section Joint Venture's ... - SRK Consulting

Amendment to the Union Section Joint Venture's ... - SRK Consulting

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 0-3: The 750 mm piles that will bedrilled and installed around <strong>the</strong> shaft.Figure 0-4: Pre cementation drill rig with adedicate compressor.Figure 0-5: The first piling hole of750mm. It will be filled with concrete<strong>to</strong> secure <strong>the</strong> foundation.Figure 0-6: The boxing offoundation for <strong>the</strong> raiseboremachine.Figure 0-7: The final concrete foundationfor raisebore machine.Figure 0-8: The Raisebore rig with <strong>the</strong>water re-cycling dam which will betemporary installed <strong>to</strong> capture and <strong>to</strong>recycle <strong>the</strong> water that is used in <strong>the</strong>process.Figure 0-9: The Raisebore rig.Figure 0-10: The Raiseboremachine in operation.Figure 0-11: Example of <strong>the</strong> construction process <strong>to</strong> be followed

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!