13.07.2015 Views

Download - Tenaga Nasional Berhad

Download - Tenaga Nasional Berhad

Download - Tenaga Nasional Berhad

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Tenaga</strong> <strong>Nasional</strong> <strong>Berhad</strong> 237 Annual Report 200913 PROPERTY, PLANT AND EQUIPMENT (CONT’D.)T transfers/A as at reclassi- As at1.9.2007 Additions Disposals fication 31.8.2008R rM’million RM’million RM’million RM’million RM’millionCompany2008Cost/valuationAt 1994 valuation:Freehold land 608.6 0 (0.6) (35.6) 572.4Buildings and civil works 445.9 0 (0.8) 0 445.11,054.5 0 (1.4) (35.6) 1,017.5At cost:Freehold land 306.3 8.8 0 (6.2) 308.9Buildings and civil works 10,063.3 295.6 (0.5) (2.3) 10,356.111,424.1 304.4 (1.9) (44.1) 11,682.5Plant and machinery 26,139.4 2,038.8 (181.7) (14.0) 27,982.5Lines and distributionmains 22,182.1 1,819.5 0 3.2 24,004.8Distribution services 2,239.7 154.1 0 0 2,393.8Meters 1,242.8 140.7 0 0 1,383.5Public lighting 276.1 18.4 0 0 294.5Furniture, fittings andoffice equipment 985.8 39.6 (2.0) (13.3) 1,010.1Motor vehicles 211.6 8.3 (3.4) 17.9 234.464,701.6 4,523.8 (189.0) (50.3) 68,986.1Capital project-inprogress6,545.9 4,439.6 0 (4,523.8) 6,461.771,247.5 8,963.4 (189.0) (4,574.1) 75,447.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!