13.07.2015 Views

Second Environmental Performance Review of Albania

Second Environmental Performance Review of Albania

Second Environmental Performance Review of Albania

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 9: Energy and environment133Electricity losses through transmission anddistribution, both technical and non-technical (illegalconnections), is a serious problem. For example, in2008 the total losses were 35 per cent <strong>of</strong> theelectricity supply (generation and importation).KESH estimates technical losses caused by obsoletetransmission lines and electricity distributionnetworks to be 20-25 per cent and commercial losses10-15 per cent. Reduction <strong>of</strong> electricity technical andcommercial losses could reduce import and/orgeneration volumes and would also improve KESH’sfinancial indicators.Recommendation 9.5:The Ministry <strong>of</strong> Economy, Trade and Energy incooperation with the relevant stakeholders shouldensure:(a) Implementing a programme to decreasetransmission and distribution losses;(b) Arranging for strict control <strong>of</strong> consumers,including increased collection <strong>of</strong> payments,reduction <strong>of</strong> illegal connections and theinstallation <strong>of</strong> electicity meters.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!